Laserfiche WebLink
General Conditions <br /> Generai Type: General Requiremenfis Level:Other <br /> Note: <br /> Unit Glty Unit Description Notes <br /> 1.00 EA Provide Building Permits&Plan Review This is merely an estimate. <br /> I wouid like to discuss a <br /> decision for you to contect <br /> the Building Official of <br /> Orono direcUy. <br /> 1.00 EA Project Start Conference Meet with homeowner to <br /> determine the desired work <br /> to be done.take preliminary <br /> measurements. <br /> 1.00 EA, 30 Yard Dumpster $10/day in addition to <br /> original cost will be incurred <br /> after 10 days. <br /> 2.00 EA Large Appliance Disposal Waste management <br /> company charges$30 per <br /> appliance to dispose. <br /> Estimated quantity of four. <br /> Demolition <br /> General Type: General Requirements Level:Other <br /> Note: <br /> Unit Qty Unit Description Notes <br /> 4.00 SQ Demo Roofrng to Sheathing Remove roof shingles to <br /> roof decking. <br /> 56.00 LF Demo Entire Exterior Wall Demo an remove garage <br /> walls. <br /> 4.00 SQ Demo Roofing Sheathing&Framing Remove roof <br /> sheathing/deckingto roof <br /> framing. <br /> 44.00 SF Demo Drywall from Walls&Ceilings Remove drywall to support <br /> frame in rear NW bedroom. <br /> 18.00 SF Demo Concrete Biock Remove foundation block <br /> on the garage floor. <br /> 201.25 SF Demo&Replace Sub Floor Remove sub floor in the <br /> porch room. <br /> 14.33 LF Demo Cabinetry-Including Countertops Remove countertops in the <br /> kitchen. <br /> 1,00 EA Bathroom-Total Demolition Estimated cost to demo all <br /> structures to wall studs. <br /> This cost is only for <br /> demolition. Remodel of <br /> bathroom will be additionel <br /> costs discussed with <br /> homeowner during the <br /> project <br /> J�' Inkfels� ! Peaes�2 of 5 <br />