My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
re driveway problems/neighbors construction
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Bay Road
>
3335 Crystal Bay Road - 17-117-23-41-0034
>
Correspondence
>
re driveway problems/neighbors construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:40:16 PM
Creation date
5/26/2016 11:55:51 AM
Metadata
Fields
Template:
x Address Old
House Number
3335
Street Name
Crystal Bay
Street Type
Road
Address
3335 Crystal Bay Road
Document Type
Correspondence
PIN
1711723410034
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i � <br /> i <br /> A�r. Paul 7. Re}unan b�� � <br /> 33�5 Crystal Bay Road ����� � <br /> Orono,Mt�? 5��91 N�� � � 2��4 <br /> ��TY oF �Rovo <br /> November 20th 200d <br /> Citv Plannina Commissioner <br /> Git��Of Orono <br /> 2750 Kelley Parl<way <br /> Orono,MN 55356 <br /> Dear Commissioner:: <br /> D�uing this past year, we have had the displeasure oChavino new home construction on the lot adjacent to <br /> us at 3329 Crystal Bay Road. During this time,construction vehicles for this home constn�ction have on <br /> several or iz�ore occasions used our drive�vay to"shortcut"or to"stage"their constructio�work. My <br /> concrete driveway was dama�ed durin�this improper use of my property, (We have a picture of their <br /> vei�icles on our property,have a witness to both the improper use and dama�e to our concrete.) The <br /> driveway is actually crushed and sunken in multiple places. <br /> We have contacted the owner/developer Fred Johnson multiple times by phone and were told that he would <br /> have the damage repaired by winter.After multiple false promises, missed appointments and absolutely no <br /> response to our complaints, it is now late November and we arc very upset. <br /> We ac�e writing you to insist that you assist us i�i seeing that this damage is repaired as prornised. My wife <br /> and I live, pay taxes, and vote in yo�u�ciry. Does Mi•. 7ohnson? When you invited us to attend meetiilgs at <br /> City Hall to question the multiple variances that Mr. Johnson was asking for, I even intervened on his <br /> behalf? We don't feel it is unreasonable to ask that before you give him a Certificate of Occupancy,that you <br /> see that our matter is taken care of to our satisfaction. <br /> We are all for"progress" in our city,but we should not have to be adversely affected by it. <br /> We would appreciate a swift response to my matter.Thank you. <br /> Best regards, <br /> ,_� , , <br /> I-� , i �- , <br /> ,t_��,ti_._ ,:- . ._ . , <br /> Paul Rehman <br /> 3335 Crystal Bay Road <br /> Orono,MN 55391 <br />
The URL can be used to link to this page
Your browser does not support the video tag.