My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00858 - new structure
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Bay Road
>
3309 Crystal Bay Road - 17-117-23-41-0016
>
Permits/Inspections
>
2014-00858 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:39:44 PM
Creation date
5/25/2016 12:45:12 PM
Metadata
Fields
Template:
x Address Old
House Number
3309
Street Name
Crystal Bay
Street Type
Road
Address
3309 Crystal Bay Road
Document Type
Permits/Inspections
PIN
1711723410016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� • = BO LTON 8�. M �N K , I N C� <br /> . � Consulting Engineers & Surveyors <br /> �� 2638 Shadow Lane, Suite 200•Chaska, MN 55318-117�RON0 COPY <br /> Phone(952)448-8838• Fax(952)448-8805 <br /> www.bolton-menk.com <br /> August 19, 2014 <br /> City of Orono <br /> Attn: Christine Mattson <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> RE: Building Permit Application 2014-00858 <br /> 3309 Crystal Bay Road <br /> Engineering Review#1 <br /> Dear Christine: <br /> As requested, I have completed an engineering review of the documents submitted for the above referenced <br /> project. Following are my comments and recommendations for your consideration: <br /> 1. Due to the narrow widths of Crystal Bay Road and the shared driveway, the applicant and his <br /> contractors must be vigilant in ensuring demolition and construction activities do not impair others in <br /> accessing adjacent properties. <br /> 2. Since the applicant will be required to export demolition materials and import fill to achieve <br /> proposed grades, the City should consider the following: <br /> a. The Applicant should confirm with the City Engineer acceptable hours of truck hauling and <br /> provide documentation on the haul route to be used. Acceptable hours and haul route should be <br /> approved prior to the removal of demolition materials or importing of any fill. <br /> b. The City Engineer should inspect roadways on haul route and the shared driveway prior to and <br /> following completion of work to determine whether adverse impacts have occurred. The <br /> applicant should be responsible for the repair to roadways for any adverse impacts. <br /> 3. The siltfence should be installed and inspected by the City prior to any land disturbing activities. <br /> The contractor must provide 24 hour notice prior to inspection. <br /> 4. If the mature oak tree on the east side of the property is damaged during demolition or construction, <br /> planting of a replacement tree should be coordinated with the City. <br /> 5. A financial security of$3,000 from the Applicant is recommended for erosion control and <br /> engineering oversight. The financial security is intended to provide protection in the event that it <br /> becomes necessary for the City to install or maintain erosion and sediment control within the project <br /> area and covers the cost of vegetation re-establishment if the applicant is unable to follow through <br /> with the conditions o�f approval. <br /> 6. The applicant will be required to obtain Minnehaha Creek Watershed District(MCWD)approval and <br /> permitting for their Erosion Control Rule. A copy of any approved permits should be submitted <br /> prior to any land alte►•ing activities. <br /> Please let me know if you have any questions or need additional information. <br /> Sincerely, <br /> BOLTON & MENK, INC. <br /> �8C 0�G �e��� <br /> Robert E. Bean,Jr., P.E. <br /> Water Resources Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.