Laserfiche WebLink
� • = BO LTON 8�. M �N K , I N C� <br /> . � Consulting Engineers & Surveyors <br /> �� 2638 Shadow Lane, Suite 200•Chaska, MN 55318-117�RON0 COPY <br /> Phone(952)448-8838• Fax(952)448-8805 <br /> www.bolton-menk.com <br /> August 19, 2014 <br /> City of Orono <br /> Attn: Christine Mattson <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> RE: Building Permit Application 2014-00858 <br /> 3309 Crystal Bay Road <br /> Engineering Review#1 <br /> Dear Christine: <br /> As requested, I have completed an engineering review of the documents submitted for the above referenced <br /> project. Following are my comments and recommendations for your consideration: <br /> 1. Due to the narrow widths of Crystal Bay Road and the shared driveway, the applicant and his <br /> contractors must be vigilant in ensuring demolition and construction activities do not impair others in <br /> accessing adjacent properties. <br /> 2. Since the applicant will be required to export demolition materials and import fill to achieve <br /> proposed grades, the City should consider the following: <br /> a. The Applicant should confirm with the City Engineer acceptable hours of truck hauling and <br /> provide documentation on the haul route to be used. Acceptable hours and haul route should be <br /> approved prior to the removal of demolition materials or importing of any fill. <br /> b. The City Engineer should inspect roadways on haul route and the shared driveway prior to and <br /> following completion of work to determine whether adverse impacts have occurred. The <br /> applicant should be responsible for the repair to roadways for any adverse impacts. <br /> 3. The siltfence should be installed and inspected by the City prior to any land disturbing activities. <br /> The contractor must provide 24 hour notice prior to inspection. <br /> 4. If the mature oak tree on the east side of the property is damaged during demolition or construction, <br /> planting of a replacement tree should be coordinated with the City. <br /> 5. A financial security of$3,000 from the Applicant is recommended for erosion control and <br /> engineering oversight. The financial security is intended to provide protection in the event that it <br /> becomes necessary for the City to install or maintain erosion and sediment control within the project <br /> area and covers the cost of vegetation re-establishment if the applicant is unable to follow through <br /> with the conditions o�f approval. <br /> 6. The applicant will be required to obtain Minnehaha Creek Watershed District(MCWD)approval and <br /> permitting for their Erosion Control Rule. A copy of any approved permits should be submitted <br /> prior to any land alte►•ing activities. <br /> Please let me know if you have any questions or need additional information. <br /> Sincerely, <br /> BOLTON & MENK, INC. <br /> �8C 0�G �e��� <br /> Robert E. Bean,Jr., P.E. <br /> Water Resources Engineer <br />