Laserfiche WebLink
HEAT—N—GLO" <br /> rJAKOTA INSTALLATION INSTRUCTIONS Lr1"cStylf� Prorlucr� <br /> c. �eniove the right side of the valve box for easier e. Reach through the back access hole of the endosure and <br /> installation of the gas line. Set aside. feed the thermocouple line, aluminum gas line and pilot <br /> 1) Bend the flanges of the remaining three sides of line through the rear of the valve box assembly. Connect <br /> the valve box 90° at the perforations (Figure 9), to the valve. See Figure 11. Tighten fittings to elminate <br /> place a bead of silicone (not provided) on the back gas leaks. <br /> side of the flanges and slide the valve box into the <br /> square hole on [he side of the FPS enclosure. (If °� <br /> you are not using an FPS enclosure, the valve �il,?t L�tle � <br /> must be located in a position where one person '�� <br /> can operate the valve and light the pilot simulta- `�� '=°����-'��� <br /> neously.j � � '�� � <br /> . <br /> � r.� �` <br /> x <br /> W . z,� <br /> � � ` `E r���i�r�i.,�.�a�i��,r1� ��� <br /> . .. . ... .is �^�, � �. <br /> r� �,2 � � �. � ��� � �� . <br /> � �� � � <br /> �" ,� �� "je� ♦ --�s R. E� � q dA,5�'` � �- <br /> � r� <br /> .'i I ,�p . � . -� . ,� ' �° <br /> � � 1��`�' � ; � 'f ���� <br /> � . . . � ' 6�a �'�'r.� <br /> I � � <br /> � , .... � � . .. ...._.... � &Y6 ,C' <br /> � � . � w � Figure 91 -Gonnect Lines to Valve <br /> ���; �„ ���'�; <br /> f .- � � :�- �""-�5 <br /> � -��� �' � ��°�,��� ,��a�� ��. r. Place the valve back on the valve bracket in the valve <br /> �`�`"""'""��� �"`�w � `� °'`��a P�.`� � box and secure using the two screws previously removed. <br /> ',��,:.'iPa�, ..-:...<:.l,.�t '���� � �z_ . <br /> (��.�� ,� '" "•"`°� t. Reach through the back access hole of the enclosure and <br /> �'--` connect the flexible stainless steel gas line to the soft <br /> Figure 9 -Remove Right Side of Valve Box& Bend Flanges aluminum gas line with the male flare connector supplied. <br /> See Figure 12. <br /> 2! Secure the 3-sided valve box to the FPS enclo- <br /> sure with the drywall screws provided. See ` <br /> �='��g���ire 10. ,� �� � <br /> �� ,�r �� �� , � � : <br /> � r� .� � <br /> ;p <br /> � ��. <br /> � � � . <br /> �. € <br /> �`�. � <br /> � �= � <br /> s� �� � ,^�� �� <br /> � ' : �,� �� <br /> � °.s� ` � <br /> � � '�- ��' ��°��� <br /> ' � � <br /> ! �,* � ���"��* ��.^��. <;� <br /> _ ~ Figure 12 -Connect Flexline <br /> k �� <br /> � � ��a <br /> � ,�� <br /> �� h. Conr�:c; the main gas line to the manual shutoff valve <br /> Figure 10 -Secure Valve Box to FPS using 'rz" male plpe thre�d (not supplied). <br /> Bend the flange of the right side of the of the valve box <br /> d. P.emove the valve from the valve box for ease of assembly g0° at the perforations, place a bead of silicone or� the <br /> by removing the two screws holding the valve to the valve back side of the flange and replace in the valve box. <br /> hrackeL Fasten with remaining screws. <br /> i. Check for gas leaks with soapy water. <br /> j. Place a bead of silicone around the inside flanges and <br /> the holes in the corners of the valve access door. Place <br /> the valve box cover on the valve box and secure using <br /> the mounting holes on the edge of the box. <br /> �' 4030-900 Rev C �a-��� <br />