My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
C
>
Cristofori Circle
>
50 Cristofori Circle - 31-118-23-44-0004
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:03 PM
Creation date
5/24/2016 11:14:18 AM
Metadata
Fields
Template:
x Address Old
House Number
50
Street Name
Cristofori
Street Type
Circle
Address
50 Cristofori Circle
Document Type
Septic
PIN
3111823440004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z3> 0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2J (minimum) <br /> (this must match the soit boring log) desired mound ratio 2.7 <br /> za� �percent site slope (0-20%range) �(%downslope site slope,if different than upstope) <br /> zs� 12 inches, or t.0 ft.to Redox or other limiting condition (need at teast 12"to be a Type I) <br /> Treatment zone contains�0 inches of Q%soil credit,and �inches of 50%soil credit. Giving a: <br /> zb� 24 inch,or 2.0 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONSl1! <br /> z�> 27.0 ft.Total ABSORPTION width (sand beyond rockbed) <br /> zs) 0.0 ft,upslope and sideslope <br /> 77.0 ft.Downslope <br /> Individua!siope ratios give BERM widths(topsoil beyond rockbed}of: <br /> 29J 4:1 upslope ratio 12 ft.upslope berm <br /> 30� 3:t sideslope 15 ft.sideslope berms <br /> 3p 3:1 downslope 23 ft.downslope berm <br /> 32� Overall Dimensions: 10 f[.wide by 62.5 ft. long Rock bed <br /> 45 ft.wide by 43 ft. tong Mound footprint <br /> 4"ins�ection pipe <br /> 18"cover on top <br /> U slo e herrn �z Rownsto e berm 23 <br /> 12"cover on sides <br /> (6"loamy cnp&6"topsoil) <br /> 2.p Clean sanci(ift <br /> 1.0 Dep.l��ta Lii�iit:in�, <br /> ___..__ ��.____. <br /> , __.__...._ <br /> Lin'nEi�7=.;C�ndihon -. _ .__ <br /> .. .___._..__�.. <br /> .,._.__.._,._t___,....._--.-._.-- <br /> Absor tion Width Z�•� -- . <br /> Note; <br /> For o to 1%stopes,Absorption bYidth is measured from the Bedequatty in both directions. <br /> For slopes>19b, .�bsorptfon Width is measured downhitt from the upslope ed,e of the Bed. <br /> �}J Rock Bed: <br /> 10 ft.by 62.5 ft.by �9 inches under pipe,plus 20%gives 28 yd'or"1.4= 39 ton <br /> 3a� Mound Sand: (note:volume is based on 3:1/4:1 slope from top of rockbed,Exchange sand for toamy cap if desired) <br /> 41.4 up + �pp,� downslope + 16.9 ends+ 56.7 under rock= 258 yd'or'1.4= 361 ton <br /> plus 20% <br /> ss� Loamy Cap: <br /> 41 ft.by 89 ft. 6"deep,plus 20%gives 87 yd'or'1.4a 113 ton <br /> 3E� Topsoit: <br /> 45 ft.by 93 ft. 6"deep,plus 20%gives 93 yd'or•1.4= 130 ton <br /> I hereby certify[hat I have completed this work in accordance with atl appt{cabte ordinances,rules and laws. <br /> �� S�''Q'��iS.1l> {J.LL , 3�14_ 4/13/2015 <br /> Designer Signature Company Licensetl Date <br /> I <br /> I <br /> i ' <br /> ; <br /> i <br /> i <br /> � <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.