Laserfiche WebLink
The soils on this site are a clay loam. The seasonaliy saturated soil,mottted soil <br /> (redox teatures)were present at a deqth of 12"to 16'. A pressurized mound system <br /> witl be installed. The bottom of the treatment area must be located at leaat 3'above <br /> mottled soil. <br /> A pumping chamber will need to be installed to Iift the effluent to the treatment area. <br /> The power supply 8� switches must be located outside the manhole&pumping <br /> chamber in a weather proot enclosure. A warning device must be installed with a <br /> light 8 sound device,tMis is in case of a pump failure. <br /> The manifold 8 supply line must have back drainage to the pumping chamber. The <br /> distrlbution pipes shail have their ends capped. Be sure the rock 8 sand itil material <br /> are clean. The sod layer below the entire mounded area must be turned over,just <br /> break up the sod. <br /> If the tanks have less than 2'of cover,the lids, risers&malntenance hole covers <br /> must be insulated to a value of RiO. <br /> Cleanouts for each lateral must be insulated &be accessible from finished grade in <br /> an irrigation box with a ball valve. <br /> All neighboring welis are located greater than 100'away from the proposed <br /> treatment area. <br /> Keep all heavy equipment off of the proposed treatment area betore and after <br /> construction. The traatment area shouid be marked off before construction. 7his <br /> design Is not valid 8�the system wtll need to be relocated if faiture to protect the <br /> sites for new on-s[fe sewage systems. <br /> MANA(3EMENT PLAN: <br /> The tanks need to be maintained at a minimum of 1 time every 2 years,check with <br /> you pumper to set up a schedule. <br /> System inspected for areas by owner 8�or Inspector as determined by the local unit <br /> of 6overnment. <br /> Any other requirements as determined by the locai unit of Government. <br /> i <br /> j <br /> I <br /> I <br /> i <br /> i <br /> i <br />