Laserfiche WebLink
, <br /> 7. Within 5 working days of superstructure removal,a final inspection sha11 be requested. The <br /> • site shall be left clean and clear of a11 debris,with any excavation filled with earth level with <br /> the adjacent ground elevation(except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 8. The undersigned owner sha11 and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses,including attorney fees,against the City,its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents,subcontractors or assi,gns. <br /> 9. Septic systems must be abandoned per Minnesota Rules Chapter�080. All sepric tanks must <br /> be pumped,crushed and filled with narive soils. An inspecrion is required after the tanks are <br /> purnped and before the tanks are crushed and filled. <br /> PERMIT TYPE AND FEE CALCULATION <br /> ✓ $50.00-Principal Structure <br /> $30.00-Accessory Structure <br /> l. Subtotal of above permit requested $ 50.00 <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE(add lines 1-2 above) $ 50.50 <br /> The undersigned hereby applies to the City of Orono for issuance of a Demolition Permit,agrees to <br /> do all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all statements made on this application are complete,true and conect. <br /> , C <br /> �� <br /> APPLICANT'S SIGNATURE: � Date: 10/15/04 <br /> OWNER'S SIGNATURE: "e'e D�: 10/15/04 <br /> APPROVED BY: Date: /o,/9 _o� <br /> Reset Form <br />