Laserfiche WebLink
. Lewis Bautista -270 Crestview Ave. Orono, MN 55356 <br /> . March 1, 2005 <br /> - Page 2 <br /> I V. Repair Garage <br /> E�usting garage has a bowed foundation wall. Removal of existing slab and garage <br /> foundation and stud walls wilUmay be necessary. Footings, slab, foundation wall and <br /> stud walls will be repaired/replaced as necessary. <br /> V. Addition of Master Bedroom <br /> A master bedroom will be constructed above the garage and connected with the <br /> existing 2"d floor of the house. The master bedroom will increase the 2nd floor by 397 <br /> sq. ft. <br /> VI. New Roof Trusses <br /> The entire main body roof and trusses of the house will be removed and will be <br /> replaced as per architectural drafts. The new dormers in the existing 2°d floor(not <br /> including the master bedroom will increase the 2°d floor by 118.5 sq ft. <br /> VII. Basement <br /> The remodeling overview in the basement includes: <br /> ■ One egress window well. <br /> ■ Replacement of 4 casement windows. <br /> ■ Addition of new basement door. <br /> ■ Stud walls and door around mechanicals. <br /> ■ One bathroom rough in. <br /> VIII. 1 St Floor <br /> The remodeling overview of first floor includes: <br /> ■ First floor general bathroom. <br /> ■ Remodeling of kitchen. <br /> ■ Garage entrance door. <br /> ■ Mudroom. <br />