Laserfiche WebLink
Christine Mattson <br /> From: Roger Peitso <br /> Sent: Tuesday, April 12, 2016 4:07 PM <br /> To: chentges@co.carver.mn.us <br /> Cc: Melanie Curtis; mfritz@mandmquality.com; Christine Mattson;Jeremy Barnhart <br /> Subject: 4220 Chippewa Lane <br /> Chip, <br /> Here is a copy of the ordinance, <br /> Sec. 58-47. - Building permit applications. <br /> (a) New residence. No building permit shall be issued for any new building that will be connected to an ISTS until a site <br /> evaluation and design is approved by the on-site systems manager. The site evaluation must include the identification <br /> of both primary and alternate drainfield sites suitable for a minimum of a five-bedroom residence. If the building will be <br /> connected to an existing system, a site evatuation and design must be approved by the city, including the existing <br /> system specifications and a future site meeting the provisions of this article. A new residence must be connected to an <br /> ISTS meeting the definition of a code system. <br /> (b) Required upgrade or replacement. A sewage treatment system not meeting the requirements of Minnesota Rules <br /> Chapter 7080, as amended, or the requirements of this article, whichever is more restrictive, must be upgraded, at a <br /> minimum, at any time a building permit is required for any improvements on, or use of, the property, subject to the <br /> following: <br /> (1) Any such system for which the city has previously issued orders requiring upgrade or replacement of the system <br /> by December 31, 2007, shall not be subject to this requirement until January 1, 2008. <br /> (2) Any such system for which the city has previously issued orders requiring upgrade or replacement of the system <br /> by December 31, 2010, shall not be subject to this requirement until January 1, 2011. <br /> (3) Regardless whether previous upgrade or replacement orders have been issued, this upgrade or replacement <br /> requirement shall not apply when said building permit is for regular maintenance or upkeep including but not <br /> limited to replacement of inechanical equipment such as air conditioning, furnaces, water heaters, or water <br /> softeners, or for re-roofing, re-siding or window replacement. <br /> (c) Construction of additiona/ bedrooms or construction including water-using appliances that will increase the sewage <br /> flow into an ISTS. A building permit shall not be issued until the city confirms that the existing ISTS is compliant and of <br /> adequate size to treat the sewage flow from the building and that a future drainfield site is designed and preserved. If <br /> the existing ISTS must be repaired or replaced, an ISTS design for both the existing ISTS and a future drainfield site <br /> must be approved before issuing a building permit. If expansion or replacement of the ISTS is required, the ISTS must <br /> be installed and inspected before a certificate of occupancy shall be issued for the construction. Failure to identify <br /> satisfactory drainfield sites for the proposed sewage flow for use now as well as a future site shall result in the denial <br /> of the building permit application. <br /> (d) Expansion of an existing building, including decks and patios; construction of an accessory building, driveway or land <br /> alteration. A future drainfield site must be designed and preserved prior to the issuance of a building permit for any <br /> expansion of an existing building, construction to an accessory building or driveway or land alteration on a property <br /> using an ISTS. A building permit will not be issued when the proposed work would preclude the use of the only future <br /> drainfield site approved by the city. <br /> (Code 1984, § 12.30(4)(F); Ord. No. 100 2nd series, §4, 2-10-1992; Ord. No. 147 2nd series, § 8, 5-13-1996; Ord. No. 199 <br /> 2nd series, § 1(12.30(4)(F)), 5-8-2000; Ord. No. 38 3rd series, § 1, 9- <br /> City of Orono <br /> Roger Peitso <br /> 1 <br />