My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design-2016
Orono
>
Property Files
>
Street Address
>
C
>
Chippewa Lane
>
4220 Chippewa Lane - 31-118-23-42-0012
>
Septic
>
Septic design-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:32:22 PM
Creation date
5/18/2016 3:03:27 PM
Metadata
Fields
Template:
x Address Old
House Number
4220
Street Name
Chippewa
Street Type
Lane
Address
4220 Chippewa Lane
Document Type
Septic
PIN
3111823420012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z3� 0.50 �pd/ftZ Absorption area Soil Loading Rate, which gives a mound ratio of 2.4 (minimum) <br /> (this must match the soil boring lo�) desired mound ratio 2.4 <br /> 2a� �percent site slope (0-20% range) �(% downslope site slope, if different than upslope) <br /> 2s> 24 inches, or 2.0 ft. to Redox or other limiting condition (need at least 12"to be a Type I) <br /> Treatment zone contains�inches of 0%soil credit, and �inches of 50%soil credit. Giving a: <br /> 26) 12 inch, or 1.0 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br /> 2�> 24.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br /> 2g) 0.0 ft. upslope and sideslope <br /> 14.0 ft. Downslope <br /> Individual slope ratios give BERM widths (topsoil beyond rockbed)of: <br /> z9� 4:1 upstope ratio 9 ft. upstope berm <br /> 30� 4:1 sideslope 15 ft. sideslope berms <br /> 3t> 4:1 downslope 22 ft. downslope berm <br /> 32> Overall Dimensions: 10.0 ft. wide by 63.0 ft. tong Rock bed <br /> 41 ft. wide by 93 ft. long Mound footprint <br /> 4" inspection pipe <br /> 18" cov�r on top <br /> Upslope berrn 0 Downsla e berm 22 <br /> . 12" cover- on sides <br /> _ _.. ' `�� (6��loamy cap&6"topsoil) <br /> �-� 1.0 ��P��� sand tift <br /> - -- -- <br /> _ . ._ <br /> 2.0 ��F�th t�� Limitin� <br /> -- — <br /> ��miti���� C;��nditlon �— -� <br /> -- . <br /> _�_ _� - ---..._ <br /> Absorptian Width 24.0 - -- <br /> �4tp: <br /> For 0 to 1�slopes, A,6sorption Width is measured from the Bedequally in both directions. <br /> For slopes >1%, Absorptr'on Width is measured downhi(t fram the upslope ed�e of the Bed. <br /> 33) Rock Bed: <br /> 10.0 ft. by 63.0 ft. by �9 inches under pipe, plus 20%gives 28 yd'or`1.4= 39 ton <br /> 3a� Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br /> 19.1 up + 72.6 downslope + 11.6 ends + 32.7 under rock = 163 ydj or�1.4= 22g ton <br /> plus 20% <br /> 3s� Loamy Cap: <br /> 37 ft. by 89 ft. 6"deep, plus 209� gives 74 yd'or"1.4= 104 ton <br /> 36) TopsoiL• <br /> 41 ft. by 93 ft. 6" deep, plus 20% �ives 85 yd'or*1.4= 119 ton <br /> �-I�lie'reby c�ertify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> y <br /> � `��j '�� 3/22/2016 <br /> Designer Signature Company License# Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.