My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
re Painters Creek maintenance project
Orono
>
Property Files
>
Street Address
>
C
>
Creekwood Tr
>
4750 Creekwood Tr - 30-118-23-33-0003
>
Correspondence
>
re Painters Creek maintenance project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:27:31 PM
Creation date
5/18/2016 2:02:42 PM
Metadata
Fields
Template:
Address
House Number
4750
Street Name
Creekwood
Street Type
Trail
Address
4750 Creekwood Trail
Document Type
Correspondence
PIN
3011823330003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 3 <br /> Fie.-� y�sa �'.n���r� � <br /> l�il�nehah�, Creek '� � �Vatershed Distrlct <br /> Improving Quality of Water,Quality of Life <br /> Gray Freshwater Center November �, 1997 <br /> Hwys. 15& 19,Navarre ��:�". <br /> `�,.�G�"E`''� " .. <br /> Mail: � r, �� i9�� <br /> 2500 Shadywood Road Mr. David M. Jellison _�};�� <br /> �Xceis�or,MN 55331-9578 4750 Creekwood Trail <br /> Phone:(612)471-0590 Orono, MN 55359 <br /> Fax:(612)471-0682 <br /> Re: Painter Creek Maintenance and Improvement Project <br /> Emai�: Wenck File #0185-04-227 <br /> adminC�?minnehahacreek.org <br /> Dear Mr. Jellison: <br /> Web Site: <br /> www.minnehahacreek.org The Minnehaha Creek Watershed District (MCWD) and the City of Orono inspected <br /> Creekwood Trail on January 2, 1997, before project construction started last winter. The <br /> MCWD inspected the road again on September 30, 1997, after receipt of your September <br /> 19, 1997 letter. The general condition of the road was found to be the same before and <br /> eoard or manaqers: after the project. The pre-project condition of the road included numerous large cracks and <br /> patched areas. During the recent road inspection, a depression along the edge of the street <br /> John E.Thomas west of your driveway was observed. This depression was not observed by MCWD <br /> President , <br /> representatives on January 2, 1997 as the edge of the road was covered with snow from the <br /> C.Woodrow Love snow plow. The MCWD believes it is unlikely that the hauling activities associated with <br /> Vice Presitlent <br /> the MCWD project caused the above damage as hauling was done during an extremely <br /> Pamela G.Blixt cold stretch of weather when the road was supported by deep frost. All soil hauling and the <br /> Treasurer <br /> removal of the large backhoe from the site occurred in January 1997. <br /> Monica Gross <br /> Secretary <br /> Thomas W. LaBounty The road was also inspected again on October 27, 1997 by Greg Gappa, public works <br /> director for Orono. Mr. Gappa indicated, in his opinion, road damage is due to poor road <br /> Thomas Maple,�r. construction. Mr. Gappa believes that infiltration of water into the road bed and <br /> Malcolm Reid subsequent frost action caused the damage along the edge of the street west of your <br /> driveway and not project re:ated traffic. <br /> I was surprised by your letter indicating that you believe the MCWD project soiled <br /> District Office: <br /> Creekwood Trail. The MCWD believes the road was soiled by a severe erosion problem <br /> caused by construction of your private driveway last summer. <br /> Diane P. Lynch A number of MCWD representatives observed your driveway while it was under <br /> District Administrator <br /> construction. After a large rain event, it was clear that a large amount of soil and rock <br /> sized material was washed down the hill from your driveway and deposited on a flat <br /> section of road near the catch basin draining the road to Painter Creek. Much of the eroded <br /> material has since washed into the creek but on September 30, 1997, some of the material <br /> remained on the street and it was evident where the soils washed up and over the curb last <br /> � Printeaonrecycledpapercontaining N:\OISS\04-22TWORD�I,DJ103o7.qESynv <br /> at least 30%post consumer waste. <br />
The URL can be used to link to this page
Your browser does not support the video tag.