Laserfiche WebLink
, <br /> e <br /> CITY OF ORONO SEPTIC SYSTEI�S PERl��ITT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, I�N 5�323 � <br /> JOB SIT'E ADDRESS: �' �(UO L �c^�.�I� c���-� /��'G <br /> Occupancti• Type: Residential �- Commercial Other <br /> . �„ <br /> Permit Type: NeFv or Replacement Sy�stem, �100.00 <br /> Repair Existing System, $ 50.00 ' <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees � <br /> *See fee schedule for non-residential permit fees <br /> �� � one�'umber: 5 2� � i `��1 <br /> Otimer's I�'ame: 2 �>�c-���S�t�-,� <br /> I�Iailing Address: � c-: , ��r'�- - 5 ����? 1�'����'v i�: �� <br /> Contractor's Name• .�-�,�v., >- ��s_ Phonel\Tumber: y Z 53 - � `-3 <br /> IYlailing Address: "�32oc l�q � <��a`.� City:�.��e�� �P� -�=���� <br /> DO \TOT �IAII� PAYi11ENT ti�IT'H THIS APPLICATIOti' <br /> GE\rERAI, Lti'STRUCTIO\S <br /> 1, Applications for septic system pennits may be mailed or submitted in person at the City <br /> Offices; however, permits will noc be mailed out. The pzrmit must be picked up in <br /> person at the Ciry Offices and work must no[bejin unless the permit card is on the job <br /> site. � <br /> 2, perrnits wi11 be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance �vith the approved septic system desi�n. Desijn <br /> reports are not conside:ed approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4, The follow•in� inspections will be required for all septic systems: _ <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to coverin�. For mounds, inspection is required <br /> afrer rough-up but prior to sand placemenc (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution pipin� installation in the rock bed. <br /> D. Fiaal i.nspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holdin�MPCA Installer Certificate shall be present durin� inspections: A 2`t- <br /> hour notice is required for all inspections. <br />