Laserfiche WebLink
_ + <br /> � <br /> '1� <br /> � � <br /> CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> JOB SITE ADDRFSS: '��' �S �r�-�_ I�c.���.� � � �-t � <br /> Occupancy Type: Residential v Commercial Other <br /> Permit Type: New or Replacement System, $100.00 Lr-, `� <br /> Repair Existing System, $ 50.00 � <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees . <br /> Owner's Name: �u�� l /�� ���.�z� PhoneNumber: ��'� ��3�-�� <br /> Mailing Address: City: 7ip: <br /> Contractor's Name:�y�.� � 5«h 5 �,��� PhoneNumber: ��7z �s�zj <j7��7� <br /> Mailing Address: 7�� � ;�Z�= SF- � � City:�.h.�=,-�t,z,Mti p�5�63 <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. � <br />