Laserfiche WebLink
DETERMINING PERMIT FEES <br /> ❑ SAC Charge(2017 Rate=$2,230.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> If'not prepaid,a sewer connection permit will not be issued) <br /> Sewer Connection/ Disconnect/ Repair($50.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; cast iron <br /> Water Connection/ Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> ❑ ��ater Availability For Future Hook-Up to Water(550.00) $ <br /> Water Availabilih' Explanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This]ine will be inspected by the Public Works Department. <br /> Required Before Water Connection Permit is Issued: <br /> 1. �ssue Water Meter& Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> ]ssue Water Connection Permit: <br /> 1. Collect Permit Fee&]ssue Water Connection Permit <br /> 1. SUBTOTAL of Pei7nit Requested: $ <br /> 2. STATE SURCHARGE $ 5.00 <br /> 3. POSTAGE&HANDLWG (Only on Mail-[n Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ <br /> ADDITIONAL INFORMATION— WATER METERS <br /> ■ �VATER METERS must be picked up and paid for at Orono City Hall,these are on a separate permit. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> Tl�e undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accordance with the ordinances of tlle City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on t�application are, true and correct. <br /> ` �' ����� .— / <br /> 7 � �� ` / <br /> Applicant: �� Date: L � // <br />