My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Creekside sewer/water service agreement
Orono
>
Property Files
>
Street Address
>
C
>
Creek Ridge Pass
>
115 Creek Ridge Pass - 03-117-23-12-0013
>
Land Use
>
Creekside sewer/water service agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:13 PM
Creation date
5/17/2016 3:00:00 PM
Metadata
Fields
Template:
x Address Old
House Number
115
Street Name
Creek Ridge
Street Type
Pass
Address
115 Creek Ridge Pass
Document Type
Land Use
PIN
0311723120013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Revision 12-14-11 <br /> i <br /> ; <br /> and operable to allow such service. Orono agrees to maintain, at its sole cost,that gortion of the <br /> water/sewer system that is located within the boundaries of City of Orono. Long Lake agrees to <br /> maintain, at its sole cost, that portion of the water/sewer system that is located within the . <br /> boundaries of the City of Long Lake. <br /> 4. USAGE CHARGES. <br /> � <br /> a. Properties with Sewer�nlv. Because one or more properties in the <br /> Creekside Service Asea do not have access to municipal water or have not yet connected to <br /> available znunicipal water,the use of water billing flows for sanitary sewer billing purposes is not <br /> feasibie ("Sewer Only Properties"). Also,the use of sanitary sewer flow metering is not practicaI or <br /> feasible based on the limited number of residences which are Sewer Only Properties. Therefore, for <br /> sanitary sewer billing purposes for the Sewer Only Properties, Long Lake will quarterly invoice <br /> Orono a standazd flat rate sanitary sewer charge based upon the average calendar first quarter <br /> municipa.l water usage for properties in the Creekside Service Area for each property�connected to <br /> Long Lake's sanitary sewer system. Orono will provide notification to Long Lake with the number <br /> of Sewer Only Properties and shall pay the flat rate for each such Sewer Only Property�within thirty <br /> (30) days of receipt of the invoice. ,. <br /> b: Properties with Water and Sewer. For water and sewer billing purposes, <br /> Orono will read the water meters for those properties connected to Long Lake's water system in the <br /> Creekside Service.Area on a quarterly basis and forward the water usage information to Long Lake. <br /> Long Lake will quarterly invaice Orono for such usage at the same billing rate for both water and <br /> sewer that is charged Long Lake customers. Orono shall pay the invoice within thirty(30)days of <br /> receipt of the invoice. <br /> •n LONG LAKE SEWER CONNECTION CHARGES. Long Lake will bill Orono <br /> a sarutary sewer connection charge for each pzoperty designated as a Category 2 or Category 3 <br /> property in Exhibit A that connects to sanitary sewer in the Creekside Service Area. .Connection to <br /> the,sanitary sewer for Category 2 and Category 3 properties is on a valuntary basis for each <br /> property and is not mandated by the City of Orono. At any time upon request of Long L,ake, Orono <br /> will provide Long Lake with the totai number of properties conriected to the sanitary sewer system, <br /> and will also notify Long Lake at the time each new connection occurs, The sewet connection <br /> charges far Category 2 and 3 properties will be as indicated in Long Lake's fee schedule for the <br /> current year, and shail consist only of a hookup fee. The h�okup fee shall be the same rate as that <br /> charged to Long Lake residents. Orono shall pay the invoice within thirty (30) days of receipt of <br /> the invoice. Long Lake,with assistance from Orono, sha11 have the right to audit the number af <br /> homes within the Creekside Service Area that have sewer connections. Note that the Long Lake � <br /> connection charges for ail Category 1 properties were paid in full at the time the subdivision was <br /> developed. <br /> 6. MCES CHARGES. <br /> a. MCES Sewer Availabilitv Char es. Orono will issue connection permits for each <br /> new conneciion and will collect the MCES Sewer Availability Charge (SAC) and forward same to <br /> MCES. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.