My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00311 - mechanical
Orono
>
Property Files
>
Street Address
>
C
>
Creek Ridge Pass
>
105 Creek Ridge Pass - 03-117-23-12-0012
>
Permits/Inspections
>
2014-00311 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:09 PM
Creation date
5/17/2016 1:30:03 PM
Metadata
Fields
Template:
x Address Old
House Number
105
Street Name
Creek Ridge
Street Type
Pass
Address
105 Creek Ridge Pass
Document Type
Permits/Inspections
PIN
0311723120012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,�!« A�c�+�rw►"�+A i l�ur� <br /> �7//! I//L�Vi /Al\I VAI� )/1 V Date: <br /> HEATING , C00LING 8c RADIANT <br /> Page: of <br /> 16411 Aberdeen St NE• Ham Lake, MN 55304 (763) 434-7747 <br /> 2795 Highway 55 East • Eagan, MN 55121 (651)452-2025 Project: <br /> www.airmechanical inc.com <br /> Ventilation, Makeup and Combustion Air Calculations <br /> Submittal Form For New Dwellings <br /> These blank submittal forms and instructions are available at the City of Chanhassen website and at City Hall. The completed form must be submit- <br /> ted in duplicate at the time of application of a mechanical permit for new construction. Additional forms may be downloaded and printed at: <br /> h tip://www.ci.chanhassen.mn.us/serv/bui Id.h tm l. <br /> Site address /�a � 1, . �� � �S J 0�,� � Date i,_/� <br /> t L —/ <br /> Contractor � ��J i+ � � "\� A !�✓� ComBY ted ;f M�l`��C�� <br /> (��c; 1) ��� ��� <br /> Section A <br /> Ventitation Quantity <br /> (Oeterrnine quantity by using Table N1104.2 or Equation 11-1j <br /> Square feet(Conditioned area induding I ^� � <br /> Basement—finished or unflnished) J � � Total reguired ventilation �7� <br /> Number of bedrooms L Continucus ventilation � / <br /> Drrections-Determine the total ond continuous ventilation rate by either using Table N2104.2 or equotion 11-1. <br /> The[able and equation are below. <br /> Table N1104.2 <br /> Total and Continuous Ventilation Rates�in cfm) <br /> Number of Bedrooms <br /> 1 2 3 4 ; S 6 <br /> Conditioned space(in Total/ Total/ Total/ Total/ TotalJ Total/ <br /> sq.ft.) continuous continuous continuous continuous continuous continuous <br /> 1000-1500 60/40 75/40 90/45 105/53 120/60 135/68 <br /> 1501-2000 70/40 85/43 100/50 115/58 130/65 145/73 <br /> �� i 2001-2500 80/40 95/48 110/55 125/63 140/70 155/78 <br /> 2501-3000 90/45 105/53 120/60 135/68 150/75 165/83 <br /> 3001-3500 ].00/50 115/58 130/65 145/73 160/80 175/88 <br /> 3501-4000 110/55 125/63 140/70 155/78 170/85 185/93 <br /> 4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 <br /> 4501-5000 130/65 145/73 160/80 175/88 ; 190/95 205/103 <br /> 5001-5500 140/70 155/78 170/85 185/93 20Q/100 215/108 <br /> 5501-6000 150/75 165/83 180/90 195/98 210/105 225/113 <br /> Equation il-1 <br /> (0.02 x square feet of conditioned space)+[15 x(number of bedrooms+1)]=Total ventilation rate(cfm) <br /> Total ventilation-The mechanical ventilation system shall provide su�cient outdoor air to equal the total ventilation rate average, <br /> for each one-hour period according to the above table or equation. For heat recovery ventilators(HRV)and energy recovery ventila- <br /> tors{ERV)the average hourly ventilation capacity must be determined in consideration of any reduction of exhaust or out outdoor <br /> air intake,or both,for defrost or other equipment cycling. <br /> Cootinuous ventilation-A minimum of 50 percent of the total ventilation rate, but not less than 40 ctm,shall be provided,on a�on- <br /> tinuous rate average for each one-hour period. The portion of the mechanical ventilation system intended to be continuous may <br /> have automatic cycling controls providing the average flow rate for each hour is met. <br /> G:\SAFETY�JK1Vent-makeup-comb air submittal(2).docx Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.