My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00074 - new structure
Orono
>
Property Files
>
Street Address
>
C
>
Creek Ridge Pass
>
105 Creek Ridge Pass - 03-117-23-12-0012
>
Permits/Inspections
>
2014-00074 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:08 PM
Creation date
5/17/2016 1:08:05 PM
Metadata
Fields
Template:
x Address Old
House Number
105
Street Name
Creek Ridge
Street Type
Pass
Address
105 Creek Ridge Pass
Document Type
Permits/Inspections
PIN
0311723120012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ventilation, Makeup and Combustion Air Calculations <br /> Submitta( Form For New Dw�liings <br /> Site address /�` ��� <br /> Contractor �� � /m � �✓ Date {v Qv/ <br /> ! `/ ( <br /> / � �� '�� � � ComBpY ted /'�a^� �i �r 4ts� <br /> � <br /> Section A <br /> Ventilation Quahtity <br /> (Determine quantity by using Ta61e N1104.2 or Equation 11�1) <br /> Square feet(Conditioned area including <br /> Basement-finished or unfinished) �� � rj �� <br /> � Total required ventilation lj`� <br /> Number o(bedrooms <br /> Continuou;ventifation rQ � <br /> Directions-Determine the tota/and cantinuous ventilation raYe by either using Toble N1104.2 or equation 11-1. <br /> The table and equation are below. <br /> Table N1104.2 <br /> Total and Continuous Ventilation Rates(in cfm) <br /> Number of Bedrooms <br /> 1 z 3 4 5 <br /> Conditioned space�in Total/ Total 6 <br /> / Total/ Total/ Total/ Total/ <br /> sq.ft.) continuous continuous continuous continuous continuous continuous <br /> 1000-1500 60/40 75/40 90/45 105/53 120/60 135/68 <br /> 1501-2000 70/40 85/43 100/50 115/S8 130/65 145/73 <br /> 2001-2500 80/40 95/48 110/55 125/63 140/70 155/78 <br /> 2501-3000 � 90/45 105/53 1z0/60 135/68 150/75 165/83 <br /> 3001-3500 100/50 115/58 130/65 145/73 160/80 175/88 <br /> 3501-4000 110/55 125/63 140/70 155/78 170/85 185/93 <br /> 4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 <br /> 4501-5000 130/65 145/73 160/80 175/88 190/95 205/103 <br /> 5001-5500 ]40/70 155/78 170/85 185/93 200/100 215/108 <br /> 5501-6000 150/75 165/83 180/90 195/98 210/105 225/113 <br /> Equation 11-1 <br /> (0.02 x square feet of conditioned space)+(15 x(number nf bedrooms+1)]-Total ventilation rate(cfm) <br /> Total vehtilation—The mechanicai ventilation system shall provide sufficient outdoor air to equal the total ventilation rate average, <br /> for each one-hour period according to the above table or equation. For heat recovery ventilators(HRV)and energy recovery ventila- <br /> tors (ERV)the average hourly ventilation capacity must be determined in consideration of any reduction of exhaust or out outdoor <br /> air intake,or both,for defrost or other equipment cycling. <br /> Continuous ventilation-A minimum of 50 percent of the total ventilation rate, but not fess than 40 cfm shall be provided, on a con- <br /> tinuous rate average for each one-hour period. The portion of the mechanical ventilation system intended to be continuous may <br /> have automatic cycling controls providing the average flow rate for each hour is met. <br /> G:ISAFETI'�JK1Vent-makeup-comh air submittal(2j.docx <br /> Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.