Laserfiche WebLink
r <br /> �Oj V� <br /> C ITY OF ORONO <br /> � �, Street Address: Mailing Address: Telephone(952)249-4600 <br /> y�, Gti 2750 Kelley Parkway P.O. Box 66 Fax (952)249-4616 <br /> lq �, Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> kESHO� <br /> October 26, 2015 <br /> Will Haack and Jeremy Thompson <br /> Gordon James Construction, Inc. <br /> PO Box 306 <br /> Maple Plain, MN 55359 <br /> Re: Building Permit Application#2015-01350 <br /> 100 Creek Ridge Pass <br /> On October 19, 2015 the City received a building permit application for construction of a new single family home. Staff <br /> conducted a preliminary review based on the information provided and recommends the following items be submitted <br /> or revised in order for your application to be considered complete and for the plan review to continue: <br /> 1. Certificate of Survey. Our engineer has reviewed the survey submitted and has the following comments: <br /> a. Two of the retaining walls depicted are 4-feet tall. Walls 4-feet or greater require engineered designs <br /> signed by a license contractor. Please submit engineered designs for our review. <br /> b. One of the walls did not depicted top and bottom wall elevations. Please have the survey updated to <br /> reflect the top and bottom wall height. If the wall is 4-feet or taller, please submit engineered plans <br /> for our review. <br /> c. The top of foundation elevation is called out on the survey, but please have the survey updated to <br /> shown the location on the foundation perimeter where the top of foundation elevation is being <br /> referenced. We expect this location (and elevation) o be consistent with information submitted on <br /> the foundation as-built survey. <br /> A copy of the City's survey requirements is enclosed. <br /> 2. Landscape Plan. Prior to the issuance of the building permit a landscape plan must be submitted showing all <br /> the proposed exterior/landscaping improvements, i.e. patios,grading,sidewalks,retaining walls,etc. The plan <br /> should include the name of the individual performing the work. The landscape plan should match what is <br /> shown on the survey. <br /> 3. Escrow&Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal <br /> of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City <br /> for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will guarantee <br /> conformance with City Code Chapter 79 relating to erosion control and stormwater. The required escrow <br /> amount for this project is$2,500. The escrow agreement is enclosed. The property owner must sign the escrow <br /> agreement and submit a check for$2,500. <br />