Laserfiche WebLink
� ' ' Erosion Control Supplemental Information <br /> � <br /> I 1 ' <br /> Final Stabil�zation will be prqvided with (seed, od, et�(). ��� (,�',�+�C� �{'� ,��?x;i�1�;���,�t� <br /> �1-�" , i,l ;r 'i'',,z1'`_�t�-�,� ���,C�r�`t�C r" c:-f"f?�P.L��:i��c;t�iT. � . <br /> and 6 inches of topsoil will be added/replaced prior to�inal stabilization. <br /> Concrete Washout: Location of concrete washout <br /> ,Off site �Indicated on site plans _Other(description): _No concrete washout: <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is greater, of all vegetation to be retained. <br /> t <br /> �Yes _Not Applicable _Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects disturbing '/ acre or <br /> greater. The inspection requirements are as follows: <br /> 1) The individual identified as being responsible for implenzenting the e�rosion control <br /> pla�i�nust routinely inspect the construction site once eve�y seven days during active <br /> construction and within 24 hours after a��ainfall event greater than 0.5 inches in 24 <br /> hour•s. <br /> 2) All inspections and maintenance conducted during coiistf�uction must be recorded in <br /> writing and these records must be retained with the erosion coiztrol plan and nzade <br /> available at tl�e Distrzct's request within 24 hours. Records of each ii7spection and <br /> mai�itenance activiry shall include: <br /> i. Date and time of inspections; <br /> ii. Name of person conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Cofrective actio�is taken (including dates, times and pm-ry cornpleting <br /> maintenance activities); and <br /> v. Date and anzount of all�•ainfall events g��eater than 0.5 iiiches in 24 hour-s. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> .}� �_ L <br /> (�. <br /> Name l���1 t�� ,j -t-���,.r\�_'I_, <br /> }� <br /> Organization ��l�_(,�U�1`��^I�� <br /> r� _�c ; � �>�-� —,(-`• <br /> r� <br /> Phone ��-- -���- — �3��-- Alternate Phone -l�- -�� � � ;,� ( � <br /> � <br /> Email ����i l C� �" ?�-�� �� ('4}=Ti � ���'{'"Y�} <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> _ ' � ,.�'� �� l <br /> Signature o A or Authorized Agent te . <br />