My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
voided permit application paperwork
Orono
>
Property Files
>
Street Address
>
C
>
Creek Ridge Pass
>
100 Creek Ridge Pass - 03-117-23-12-0016
>
Land Use
>
voided permit application paperwork
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:21 PM
Creation date
5/16/2016 2:32:01 PM
Metadata
Fields
Template:
x Address Old
House Number
100
Street Name
Creek Ridge
Street Type
Pass
Address
100 Creek Ridge Pass
Document Type
Land Use
PIN
0311723120016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ' ' Erosion Control Supplemental Information <br /> � <br /> I 1 ' <br /> Final Stabil�zation will be prqvided with (seed, od, et�(). ��� (,�',�+�C� �{'� ,��?x;i�1�;���,�t� <br /> �1-�" , i,l ;r 'i'',,z1'`_�t�-�,� ���,C�r�`t�C r" c:-f"f?�P.L��:i��c;t�iT. � . <br /> and 6 inches of topsoil will be added/replaced prior to�inal stabilization. <br /> Concrete Washout: Location of concrete washout <br /> ,Off site �Indicated on site plans _Other(description): _No concrete washout: <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is greater, of all vegetation to be retained. <br /> t <br /> �Yes _Not Applicable _Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects disturbing '/ acre or <br /> greater. The inspection requirements are as follows: <br /> 1) The individual identified as being responsible for implenzenting the e�rosion control <br /> pla�i�nust routinely inspect the construction site once eve�y seven days during active <br /> construction and within 24 hours after a��ainfall event greater than 0.5 inches in 24 <br /> hour•s. <br /> 2) All inspections and maintenance conducted during coiistf�uction must be recorded in <br /> writing and these records must be retained with the erosion coiztrol plan and nzade <br /> available at tl�e Distrzct's request within 24 hours. Records of each ii7spection and <br /> mai�itenance activiry shall include: <br /> i. Date and time of inspections; <br /> ii. Name of person conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Cofrective actio�is taken (including dates, times and pm-ry cornpleting <br /> maintenance activities); and <br /> v. Date and anzount of all�•ainfall events g��eater than 0.5 iiiches in 24 hour-s. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> .}� �_ L <br /> (�. <br /> Name l���1 t�� ,j -t-���,.r\�_'I_, <br /> }� <br /> Organization ��l�_(,�U�1`��^I�� <br /> r� _�c ; � �>�-� —,(-`• <br /> r� <br /> Phone ��-- -���- — �3��-- Alternate Phone -l�- -�� � � ;,� ( � <br /> � <br /> Email ����i l C� �" ?�-�� �� ('4}=Ti � ���'{'"Y�} <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> _ ' � ,.�'� �� l <br /> Signature o A or Authorized Agent te . <br />
The URL can be used to link to this page
Your browser does not support the video tag.