Laserfiche WebLink
Melanie Curtis <br /> From: Melanie Curtis <br /> Sent: Wednesday, October 10, 2012 8:39 AM <br /> To: Dean Johnson HOMETIME (DJohnson@hometime.com) <br /> Cc: 'info@sharrattdesign.com' <br /> Subject: FW: 20121009 80 Creek Ridge Pass 2012-0964 <br /> Dean <br /> Please see the comments below from our City Engineer. Provide copies of a revised survey which address the issue <br /> below. I will conduct the zoning review upon receiving a survey our engineer can approve. In the meantime I will pass <br /> the architectural plans along to the building official for the building code review. <br /> Thank you — Melanie <br /> Melanie Curtis <br /> Planning &Zoning Coordinator <br /> City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> Direct Dial: 952.249.4627 <br /> Fax: 952.249.4616 <br /> Planning&Zoning Office 952.249.4620 <br /> Email: mcurtis(a�ci.orono.mn.us <br /> Website: www.ci.orono.mn.us <br /> City of Orono Office Hours <br /> Monday - Friday 8:00 am - 4:30 pm <br /> From: Jesse Struve <br /> Sent: Tuesday, October 09, 2012 3:58 PM <br /> To: Melanie Curtis <br /> Cc: Christine Mattson <br /> Subject: 20121009 80 Creek Ridge Pass 2012-0964 <br /> Melanie, <br /> I have reviewed the proposed application for the new home at 80 Creek Ridge Pass(plans dated 9/25/12) and have the <br /> following comments: <br /> 1. The survey needs to show the existing storm sewer located on the SE property boundary and the edge of the <br /> stormwater pond. There is a note calling out "storm sewer on line", and I believe a dashed line indicates the <br /> storm sewer, but it is not completely clear. The existing utilities should be a different line style than the <br /> contours, easements, and setback lines. <br /> 2. The proposed retaining wall is shown at 4' in height. If when the wall is installed exceeds 4' or if a tiered wall is <br /> over 4' and not separated by 2x the height of the taller wall (as measured from the face of the upper wall to the <br /> back of the lower wall), the applicant will be required to submit plans and specifications for the wall signed by a <br /> registered professional engineer. <br /> Please contact me with any questions or concerns. <br /> Jesse Struve, PE <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> � <br />