Laserfiche WebLink
, f:ITY OF ORONO SEPTICSYSTEI�IPERiZ-IITAPPLICATIO� <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, I�I�t ��323 <br /> � . <br /> �, �C' �' � � �� y �n � �/, <br /> JOB STTE ADDRESS: l � <br /> Occupancti• Type: Residential �_ Commercial Other <br /> �-----=,-�, ' <br /> Permit T�•pe: Nesv or RepIacement Sy-stem, �100.00 � <br /> Repair Existing System, $ 50.00 ' <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> O�mer's I�ta.me� / /�' J �S� �' �7 � ��i �'1— PhoneNumber: � �7S= l �l � <br /> Nlailing Address: City: �P� <br /> Contractor's i�'ame:�' ' �.�..�.� Phonel\Tumber:�.�7- ��5' c� <br /> Cit ��� � - Z;p: .5�� �� <br /> Niailing Address: $ �- � � �' y� <br /> DO tiTOT 1�IAII., PA.YI`"IENT ��ITH THIS APPLICATIOti' <br /> GE`rERAI. �i 'STRUCTIO\TS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permics will no[ be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2, permits will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance �vith the approved septic system desi;n. Desi?n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4. The follow•in� inspections will be required for all septic systems: _ <br /> A. Pre-installation site inspection to include inspector, i.nstaller, and general concractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to coverin�. For mounds, inspection is required <br /> afcer rouah-up buc prior to sand placemenc (sand will be jar tested for silt content), <br /> and a�ain during pressure distribution pipin� installation in the rock bed. <br /> D. Final inspection to verify proper final cover depchs and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holdin�MPCA Installer Certificate shall be presen[ durin� inspections: A 2`�' <br /> hour notice i.s required for all inspections. <br />