Laserfiche WebLink
1 r <br /> Builder Acknowledgement Form <br /> 787 Boulder Drive / #2016-00157 <br /> Builder <br /> Permit Conditions Initials <br /> Prior to the start of framing, a foundation as-built survey must be submitted n <br /> and approved by the City or a stop work order will be issued. � �J <br /> Schedule a minimum of one hour for the framing inspection. �� <br /> Erosion control mechanisms must be installed and inspected by the City <br /> proper to any land disturbing activities. The contractor must provide a � � <br /> minimum of a 24 hour notice prior to inspection. <br /> Erosion control shall be installed and maintained throughout the entire <br /> project and must remain until vegetation has been established. S � <br /> The retaining walls shown are depicted right at the threshold for requiring a <br /> design signed by a professional engineer. Tiered walls are considered one <br /> wall unless they are separated by twice the height of the higher wall. If it is <br /> anticipated the walls will be closer together than depicted or should the top '�1�.� <br /> wall increase in height, a design will be required to be submitted and <br /> approved prior to construction. <br /> Prior to the issuance of a Certificate of Occupancy all inspections and <br /> life/safety issues must be completed. � � <br /> Prior to the release of the escrow money, an as-built survey must be S �� <br /> submitted and approved. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios, grading, <br /> sidewalks, retaining walls, etc. not currently shown on the approved survey � <br /> and landscaping plan will require a separate Zoning Permit application to be <br /> submitted and approved prior to the work commencing. <br /> w:\street files\boulder drive\787\builder acknowledgement form 2016-00157.docx <br />