My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00157 - New house
Orono
>
Property Files
>
Street Address
>
B
>
Boulder Drive
>
787 Boulder Drive - PID: 33-118-23-11-0132 - New PID
>
Permits/Inspections
>
2016-00157 - New house
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:05 PM
Creation date
5/12/2016 11:01:22 AM
Metadata
Fields
Template:
x Address Old
House Number
787
Street Name
Boulder
Street Type
Drive
Address
787 Boulder Drive
Document Type
Permits/Inspections
PIN
3311823110132
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J � <br /> RECEIVED <br /> Erosion Control 5upplemental Information f i=E 2 3 2016 <br /> NO <br /> Final Stabilization will be provided with (seed, sod, etc): <br /> and 6 inches of topsoil will be added/replaced prior to final stabilization. <br /> Concrete Washout: Location of concrete washout <br /> Off site _Indicated on site plans _Other(description): _Contained on truck: <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is greater, of all vegetation to be retained. <br /> ✓ Yes _Not Applicable _Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects disturbing'/4 acre or <br /> greater.The inspection requirements are as follows: <br /> 1) The individual identified as being responsible for implementing the erosion control <br /> plan must routinely inspect the construction site once every seven days during active <br /> construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 <br /> hours. <br /> 2) All inspections and maintenance conducted during construction must be recorded in <br /> writing and these records must be retained with the erosion control plan and made <br /> available at the District's request within 24 hours.Records of each inspection and <br /> maintenance activity shall include: <br /> i. Date and time of inspections; <br /> ii. Name ofperson conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Corrective actions taken(including dates, times and party completing <br /> maintenance activities);and <br /> v. Date and amount of all rainfall events greater than 0.5 inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name � � � <br /> Organization W d Q �L � � �� � � Vr � <br /> Phone (Q�� �� I u•��a9 Alternate Phone 7S� -3 y.�= Os�l3 <br /> Email ���.1� N � wOOd�l►L� �N� �.�G �t s � C,p 1�, w„� <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> C �r.�- _ ,_ __-- � <br /> .. �- __ """-e.�"'� � � <br /> Signature of Applicant or Authorized Agent Dat <br />
The URL can be used to link to this page
Your browser does not support the video tag.