My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-004708 - new septic system
Orono
>
Property Files
>
Street Address
>
C
>
Cox Farm Road
>
930 Cox Farm Road - 27-118-23-33-0013
>
Permits/Inspections
>
1992-004708 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:20:51 PM
Creation date
5/11/2016 12:56:19 PM
Metadata
Fields
Template:
x Address Old
House Number
930
Street Name
Cox Farm
Street Type
Road
Address
930 Cox Farm Road
Document Type
Permits/Inspections
PIN
2711823330013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ' . . .Tir� ,h��,�sa.,� <br /> , � 6�'r�,��✓�.�s �,-Zo <br /> PfOUND DESIGN PROCEDURE (Continued) <br /> (For Flows up to 1200 gpd) <br /> � <br /> G.3. Calculate basal width ratio H.2.f, riultiply dike multiplier by <br /> by dividing rock layer downslope mound height to get <br /> loading rate of 1.20 gpd/ft2 downslope dike width; <br /> by allowable soil loading ,j.5�6 X.,� 7. =10, 6 ft <br /> rate; <br /> 1.20 gpdi f t� �O._.5gpd/f t2 = Z, y0 �• Compare the values of step H. 1 <br /> , - and step H.2.f. Select the <br /> Check this value on page E-16, greater of the two values as <br /> 4. Multiply b�sal width ratio by the downslope dike width; <br /> rock layer width to get 1Q���,6.:'� feet <br /> required basal width; , h. Calculate upslope dike width <br /> .,Z� �s�'D x /O f t =2y O f t , , using upslope mound height <br /> � and upslope dike multiplier <br /> H. Downslope Dike Width fram page �'-18• <br /> .3�L1 :c �.o = ' g - f t <br /> 1. If landslope is 3% or more, i. Total mound widt�i is the sum <br /> subtract rock layer width of upslope dike width plus rock <br /> from basal width to obtain layer width plus downslope d���:e <br /> minimum do�,mslope dike toe w'idth widtn• <br /> y.�� ft - �ft =�y Oft � /n. S/ft�+ /Q ft +��.�ift = L�d.OtC <br /> 2. Calculate mound height at edge 3. If landslope is 2.9 percent or <br /> of rock layer on. docanslope side; less, basal width includes botti <br /> a. Determine depth of clean sand the upslope and downslope dike <br /> fill at upslope edge of rock widtlis. <br /> layer: /, O feet <br /> b. Tfultiply rock layer width by a. Calculate downslope dike width <br /> landslope to determine drop using steps H.2.a. throup,h <br /> in elevation; H.2.f; feet <br /> �O x �% = 100 =�. �ft b. Calculare upslope dike width <br /> c. Add drop in elevation to depth usinh upslope mound hei�ht and <br /> of clean sand at upslope ed�e dike multiplier from Page �-18; <br /> of rock layer �to get depth of a f t = f t <br /> clean sand at downslope edge � c. Add downslope dike width to <br /> of rock layer. upsZope dike width to rock <br /> Q„ 7'ft + /. Oft = �. 7ft layer width to get total mound <br /> d. Add depth of clean sand at down- width; <br /> slope edge to depth of rock it + ft + ft = ft <br /> layer to depth of soil backfill — <br /> to get mound height at downslope d• Comoare total mound wicltti to <br /> edge of rock layer;' required basal width from step <br /> � .�ft +/,- Oft +/,Oft =,3. �ft G.4 . If total mound width is <br /> � greater than required basal <br /> e. Enter table on page �-13 with width, use calculated dike <br /> landslope and downslope dike widths. If required basal <br /> ratio. Select dike multiplier widtn is greater than total <br /> of .S. S� y;/ ,f�dPC mou.^.d width, increase dowilslone <br /> dike width. <br />
The URL can be used to link to this page
Your browser does not support the video tag.