Laserfiche WebLink
r ys� / //` '� <br /> ,` <br /> CITY OF ORONO SEPTIC SYSTE�1 PERI`-IIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, �1�t 5�323 <br /> JOB STTE ADDRESS: z � SS C�r�v��'�^�+ „Sc� I�i . <br /> Occupancy Type: Residential X Commercial Other <br /> Permit Type: X IV'e�v or Replacement Sy�stem, $100.00 <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: � ���.�� Phone Number: <br /> I��Iailing Address: City: �P� <br /> Contractor's Name: C.�v�-e�- �f�; l ( PhoneNumber: y7�(—Z 2 �l � <br /> I��Iailing Address: City: 7�p� <br /> DO NOT NSAII� PA'Yi��IENT WTTH THIS APPLICATION <br /> GE\'ERAL INSTRUCTIO\TS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a Ciry of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4. The followinj inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rouah-up bu[ prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution pipinJ installation in the rock bed. <br /> D. Final inspection to verify proper final cover depchs and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holdin� MPCA Installer Certificate shall be present durin' inspections: A 24- <br /> hour notice is required for all inspections. <br />