Laserfiche WebLink
OCT-10-2a03 16�46 REGIONRL EAST 612 303 2258 P.02 <br /> D.ATE: October 10, 2003 <br /> TO: Lyle Oman,Building Official <br /> F�tOM: David and Nicole Nussbaum <br /> SUBJECT: Permit Sup�lement <br /> We are applying for a petmit to cross clty ovmed pzoperiy along Old Crystal Bay Road,in ordet to <br /> briz�g in soil (�340 yards)to construct a 150' long planting bed along the back side of the Baker to <br /> Luce Line Bike Path(planting bed to be more than 8 feet from the back ed�e of the bike path). <br /> l�undee Nursery(Jay Siedschlaw)�uvill be overseeing the building and design of the planring bed. <br /> We have narrowed the sub-coni�'actors who would provide tk�e soil for the proj�ct to Bo11ig& Sons <br /> (MitarAetonka) or poboszenski&Sons(Loretto). Both indicated they would do their best to protect <br /> the tcail(pertx�it applied for from the Three�tivers Park District to cross the bike path) and to limit <br /> any fmpact on the grassy area r�preset�ting the point of entry from Old Crystal Bay Road. Bollig& <br /> Sons iz�dicated they would put down"conbit"to protect the trail and Doboszenski indicated they <br /> would put down plywood sheeting and dirt to protect the trail. <br /> Please note,no curbing exists along the proposed point of entry from Old Crystal Bay Road. <br /> We are attempting to complete the project during November,a time of tk�e year when the use of the <br /> trail is probably below average due to lowet temperatures. Tn addition, vti+e believe completing the <br /> project during�Tovember would have less impact on the bike path,and city owned prope�rty, as the <br /> ground will likel�firm during the late fall months. <br /> Tn-roi p r�� <br />