Laserfiche WebLink
[ •''�" <br /> CITY OF ORONO S�PTIC SYSTEiYI PERltiIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, I��t ��323 <br /> . � -�/S- C��� �� S�� �rr��� ('`i�- <br /> JOE STI'E ADDRESS. <br /> Occupancy Type: Residential Commercial <br /> Other <br /> New or Replacement System, $100.00 � <br /> Permit Type: $ �p.00 <br /> Repair Existing System, <br /> ('Tanks or Drainfield) <br /> 0.�0 State surcharge added to above fees <br /> �`See fee schedule for non-residential permit fees <br /> Owner's Name: �fn, �i�t�1 <br /> Phone Number: S S D� �7��� <br /> Mailing Address: City: �P� <br /> , ;� �.<.�_ PhoneNumber: �i'7�f-2 Z `�7 <br /> Contractor s Name: G f�e�` 1���G( � <br /> Mailing Address: �4 �o� 3S`� City: L��r'G�o 7�P: 5 5 35� <br /> DO NOT MAII.. PAYMENT WITH THIS APPLICATION <br /> GE�IERAI, I'i�1STRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3, All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4, The followin� inspections will be required for all septic systems: <br /> A. pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to coverina. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br />