Laserfiche WebLink
; � ������ �. ��� <br /> ��J �A <br /> SAWHORSE <br /> DESIGNERS & BUILDERS <br /> Don& Kristina Peterson CPR Date: 9/10/08 <br /> 2695 Coeantryside Drive West Rev: <br /> Orono, MN 55356 <br /> Job # 2034 <br /> O SCOPE OF PROJECT: Master Bath remodel <br /> [] Walls to be removed shown as "shaded" on existing plan. New walls constructed are <br /> shown as "cross hatched" on proposed plan. Remove existing soffits ar�d crown <br /> moulding at ceiling. Remove and dispose of existing cabinetry, faucets& countertops. <br /> Remove toilet. Remove existing tub & deck. Remove existing shower door, a11 bathroom <br /> flooring& wall tile. Remove towel bars, medicine cabinets/mirrors in larger room of <br /> bathroom. (shelving& hardware in toilet area to remain.) <br /> [] WINDOWS- <br /> 1. Remove and dispose of existing window. Re-size opening for window #2. <br /> Match existing stucco siding as close as possible. <br /> 2. Hy-lite I_,0204 Acrylic gfass block windows <br /> (Qty. 2, mulled together) <br /> Rough opening: 46 1/2" x 39 7/8" (R.O. Includes 3/8" @ sill) <br /> Block size: 8" x 8" x 2" (or 6"x6" size) <br /> Glazing: wave or ribbed <br /> Exterior finish: vinyl -White, or tan <br /> Interior finish: Same as exterior <br /> Jamb size: 6 3/4" due to existing 2x6 stud walls <br /> Sash is fixed. No blinds or shades included in this contract <br /> Trim: Tiled jambs <br /> [] INTERIOR DOORS- <br /> A. Remove existing door& hardware for Re-installation with new casing both sides. <br /> Trim: Poplar L-332, painted by Sawhorse. <br /> B. Existing door to remain, protect as needed. Remove& replace bathroom side casings. <br /> Trim: Poplar L-332, painted by Sawhorse. <br /> [] ELECTRIC per contract: <br /> . ALL FIXTURES (UL listed), if on job site at electrical finish, are furnished by <br /> owner, installed by SAWHORSE_ <br /> • SAWHORSE to supply & install recessed cans per contract. <br /> • Switch and outlets to be"IVORY" color. <br /> . ALL electrical openings in exterior walls require an "air-tight" rough-in box. <br /> • No smoke detector is included in this contract, clients to provide battery operated <br /> smoke detectors& CO detector. <br /> • Electrical connections and devices to be removed as needed for remodeling. <br /> • Circuits added as needed for addition/remodeling. <br /> The following are electrical items included in your contract: <br /> NO - standard receptacles (wall duplex outlets) <br /> 4 -ground fault interrupter(GFI)receptacles(two inside cabinet drawers) <br />