My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-00426 - attached deck
Orono
>
Property Files
>
Street Address
>
C
>
Countryside Drive West
>
2670 Countryside Drive West - 04-117-23-12-0013
>
Permits/Inspections
>
2008-00426 - attached deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:07:05 PM
Creation date
5/3/2016 11:31:41 AM
Metadata
Fields
Template:
x Address Old
House Number
2670
Street Name
Countryside
Street Type
Drive
Street Direction
West
Address
2670 Countryside Dr W
Document Type
Permits/Inspections
PIN
0411723120013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 8 ER-5110 <br /> . construction foundation bracket,are installed vertically plumb. foundation anchors and compliance ofthe installation with the <br /> The foundation anchors are installed in a smooth,continuous approved construction documents and this evaluation repoR. <br /> manner,with the rate of rotation being within the range of 5 to In lieu of continuous special inspection, periodic special <br /> 20 revolutions per minute. Extensions are connected to the inspection in accordance with Section 1701.6.2 of the code is <br /> foundation anchor using the bofts specified in Table 2. permitted provided that installers are certified by the <br /> Coupling bolts must be tightened firmly with a wrench.The manufacturer and structural observations in accordance with <br /> foundation anchors are installed to the minimum depth shown Section 1702 are provided. <br /> on the plans,but with the top helix not less than 5 feet(1524 periodic inspections shall be performed in accordance with <br /> mm)below the bottom of the foundation. the following schedule, subject to the building official's <br /> 2.4.1.2 C150-0121,C150-0147,C150-0298 and C150-0299 approval: <br /> Foundation Repalr Brackets:The T-shaped upper bracket �, gefore the start of work Verify manufacturer, verify <br /> body is slid over the end of the extension of the installed installer's certification by the manufacturer, and confirm <br /> foundation anchor.The lower bracket body is attached to the pier and bracket configuration compliance with <br /> concrete foundation by means of a concrete anchor construction documents and this evaluation report. <br /> complying with the code or a current evaluation report. The 2, Installation of first helical steel pier—Verify that location, <br /> lower bracket body is attached to the upper bracket body installation torque,and depth of helical steel piers comply <br /> using the I'rfting bolts.A jack placed on top of the T-shaped �h construction documents.Veriy that installers keep an <br /> section of the bracket,with a jacking tool on top of the jack installation log. <br /> and connected to the lifting bolts, is used to lift the lower <br /> bracket body as it pushes down on the upper bracket body. 3. First connection to building structure—Verify that <br /> The nuts on the bolts are tightened and the jack is removed. installation of foundation repair brackets or new <br /> 2.4.1.3 Slab Repair Bracket: The slab repair bracket is �nstruction brackets complies with construction <br /> installed on top of a foundation anchor that has been installed documents and this evaluation report. <br /> through a 6-inch-diameter(152 mm)hole core-drilled through 4. End of work—Verify that installation log complies with <br /> the concrete slab.The top of the foundation anchor shall be requirements specified in the construction documents; <br /> 1 inch (25 mm) below the slab. Prior to installing the verify that installation of all structural connections <br /> foundation anchor, a 1-foot-deep (304.8 mm) pocket is �mplies with construction documents and this evaluation <br /> + excavated in the subgrade beneath the hole in the slab.The report. <br /> slab repair bracket tube is placed over the foundation anchor 2.5 Identification: <br /> shaft.The slab repair bracket channel is placed on top of the Foundation anchors have the word "CHANCE"stamped on <br /> bracket tube.The leveling boft is threaded into the channel the top of the helix.The foundation anchors are also identified <br /> I and tube, positioning the bracket so that each end of the by a tag or label bea�ng the name and address of A. B. <br /> channel is in contact with at least 4 square inches(2580 mm) Chance Co.,the catalog number,the product description,the <br /> of the slab. The maximum torque on the bolt is 150 ft.-Ibs. evaluation report number (ER-5110), and the name of the <br /> ' (203 N•m).See Figure 5 for typical installation details. inspection agency(RADCO).The brackets are identified by <br /> 2.4.1.4 New-construction Foundation Bracket:The end labels bearing the catalog number and product description.In <br /> of the shaft of the installed foundation anchor is cut off,or the addition,the letter'C'is stamped on the No.C150-0121,No. <br /> pier is installed until the shaft top is a minimum of 3 inches C150-0298,No.C150-0299 and No.C150-0147 brackets. <br /> (76 mm)above the foundation subgrade or at a level where 3.0 EVIDENCE SUBMITTED <br /> ' the bracket will support an upper layer of steel reinforcing <br /> bars in the concrete foundation. The new-construdion Material specifications,installation instructions,load tests and <br /> j foundation bracket is placed over,and seated on the top of, a quality control manual. <br /> the foundation anchor shaft.The steel reinforcing bars of the 4.0 FINDINGS <br /> foundation are placed in direct contact with the top of the That the HELICAL PIER°Foundation Systems described <br /> bracket. If required, the bracket is connected to the �n this report comply with the 1997 Unlform Bullding <br /> ' foundation anchor shaft with a /4 inch�iiameter(19 mm)bolt ,,,, <br /> installed through a 13/1e inch-diameter (20.6 mm) hole Code ,subject to the following conditions: <br /> predrilled in 1'/2-inch(38 mm)RCS foundation anchor shafts, 4.1 The foundation anchors are manufactured at the A. <br /> or a'/8 inch-diameter(22 mm)bolt installed through a 1-inch- B. Chance Co. facility located at 210 North Allen <br /> diameter(25 mm)hole predrilled in 1314 inch(44.5 mm)RCS Street,In Centralla,Mlssouri,undera qualitycontrol <br /> foundation anchor shafts.See Figure 6. program with inspections by RADCO(AA-650). <br /> 2.4.1.5 Light-duty Underpinning Bracket:The end of the 4.2 The foundation anchors are manufactured, <br /> shaft of the installed foundation anchor is cut off or the identified and installed In accordance wlth this <br /> foundation anchor is installed until the shaft top is a minimum report. <br /> of 1 inch (25 mm) below the bottom of the slab. The bolt 4.3 Special inspection is provided in accordance with <br /> guide is placed on top of the foundation anchor shaft and the <br /> pipe of the bracket is slipped over the shaft.The bracket is Section 2.4.2 of this report. <br /> attached to the concrete slab by means of concrete anchors 4.4 Engineering calculations and drawings, in <br /> installed in accordance with the evaluation report on the accordance with recognized engineering principles <br /> anchor.The lifting bolt is threaded into the pipe cap so that its and deslgn parameters,are p�ovided to the building <br /> base engages the bolt guide inside the pipe.The maximum ofFicial. <br /> torque on the bolt is 200 ft.-Ibs.(27.1 N•m).See Figure 8 for 4.5 A soll Investigation must be provided for each <br /> installation details. <br /> project site in accordance with Section 2.3.1 of this <br /> 2.4.2 Special Inspection:Special inspection in accordance report. <br /> with Section 1701 of the code shall be provided for the <br /> installation of the foundation anchors and foundation 4.6 The applied factored loads must not exceed the <br /> brackets.Items to be confirmed by the special inspector shall design strength loads in Section 2.3 of this report. <br /> include,but not be limited to,the manutacturers certification This report Is subject to re-examination in one year. <br /> of installers, the installation torque and depth of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.