My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info/design
Orono
>
Property Files
>
Street Address
>
C
>
Countryside Drive West
>
2670 Countryside Drive West - 04-117-23-12-0013
>
Septic
>
septic info/design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:07:06 PM
Creation date
5/3/2016 11:22:20 AM
Metadata
Fields
Template:
x Address Old
House Number
2670
Street Name
Countryside
Street Type
Drive
Street Direction
West
Address
2670 Countryside Dr W
Document Type
Septic
PIN
0411723120013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Z(�1 C� ('�u�v-r 2 � 51 `� l� � R �� <br /> S'P' TESTING, INC. Steven B. Schirmers — MPCA Cert. No. �27 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> December 19 , 1993 <br /> Dickey site <br /> Lot 5 , Block 2 <br /> Orono, Henn . Co. , MN <br /> This On-Site Sewage Treatment System is Designed for a Type 1 , five <br /> bedroom home in accordance with the Minnesota Pollution Control <br /> Agency Chapter 7080 arid local ordinances . <br /> The soils on this site are SCS soils mapped - LrB - Lester loam. <br /> A seasonally high water table was located at 18" to 32" (mottled <br /> soil ) . Due to the seasonally high water table, a Pressurized <br /> Mound System will need to be installed. The bottom of the rock <br /> bed must be located at least 3 ' above the seasonally high water <br /> table . <br /> The soils at a depth of 12" have a percolation rate averaging <br /> 8 . 1 min/inch . <br /> A pumping chamber will need to be installed to lift the effluent <br /> to the treatment area . <br /> The manifold �n�l suc�c�J.y line pip� must have �aacic drainage to the pumping <br /> chamber . The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill material are clean . The sod layer below the <br /> entire mounded area must be turned over , just break up the sod , be sure <br /> not to over work . <br /> The power supply and switches must be located outside the manhole and <br /> pumping chamber in a weather proof enclosure . A warning device must <br /> be installed with a light and sound device , this is in case of a pump <br /> failure . Mercury floats are a good method . <br /> All neighboring wells are located greater than 100 ' away from the <br /> proposed treatment area . <br /> CONT ' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.