My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-008926 - new septic
Orono
>
Property Files
>
Street Address
>
C
>
Countryside Drive West
>
2650 Countryside Drive West - 04-117-23-12-0014
>
Septic
>
1997-008926 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:07:07 PM
Creation date
5/2/2016 3:50:19 PM
Metadata
Fields
Template:
x Address Old
House Number
2650
Street Name
Countryside
Street Type
Drive
Street Direction
West
Address
2650 Countryside Dr W
Document Type
Septic
PIN
0411723120014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� , ��P TESTING, INC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> � 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License #394 <br /> May 17, 1997 <br /> Tony Eiden Company <br /> 2650 Countryside Drive W. <br /> ( lot 6, BIk.2 ) <br /> Orono, Henn. Co., MN <br /> This on-site sewage treatment system is designed for a Type 1, five bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site are SCS soils mapped - LtB - LeSueur. The seasonally saturated <br /> soils were located at 18" to 24" (mottled soil). Due to the seasonally saturated soils, a <br /> Pressurized Mound System will need to be installed to treat septic effluent. The bottom <br /> of the treatment area must be located at least 3' above the saturated soils. <br /> The soits at a depth of 12" have a percolation rate averaging 9.2 mpi. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A warning device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod, be sure not to over work. <br /> All neighboring wells are located greater than 100' away from the proposed treatment <br /> area. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.