Laserfiche WebLink
�� � <br /> /Q <br /> , .✓� _� <br /> CITY OF ORO�'O SEPTIC SYSTE�I PERl�IIT APPLICATION <br /> Box 66 (2750 Kelley Parkwav) <br /> Crystal Bay, N�t 55323 <br /> JOB STI'E ADDRESS: 2 � S� C-� un �� �r�(�e ,�r� <br /> Occupancy Type: Residential '1C Commercial Other <br /> Permit Type: � Ne�v or Replacement Sy�stem, $100.00 � <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> , *See fee schedule for non-residential permit fees <br /> O�mer's Name: ���u� PhoneNumber: <br /> 1�Iailing Address: City: �p� <br /> Contractor's i�'ame: /' l�Urr� 1-�,-�( PhoneNumber: ��?�t- � Z4� % <br /> I�Iailing Address: City: �p� <br /> DO NOT 1�iAII.. PAYI�iENT WTTH THIS APPLICATION <br /> GENERAI. INSTRUCTIO\TS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Desijn <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The follow�in� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include i.nspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain durin; pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holdin�MPCA Installer Certificate shall be present durin� inspections: A 24- <br /> hour notice is required for all inspections. <br />