Laserfiche WebLink
. . � s/a3/a� �9b�7�5 <br /> ,�s�� <br /> CITY OF ORONO SEPTTC SYSTEM PERNIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,Mn 55323 <br /> ,-, <br /> JOB SITE ADDRESS at' ��3"s' -�t.�-r�u ���� �. l�- <br /> Occupancy Type: Residential�_ Commercial Other <br /> Permit Type: New or Replacement System $100.00 <br /> Repair Existing System $ 50.00 �,�-�- <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> Owner's Name: ���,Q�I�D ��-2.OSs Phone Number: �S a-'y�/� —7.3,j� <br /> Mailing Address: �t b 3�- 'v. %�� -. City: U�c�,�r� Zip: 3� <br /> Contractor's Name: ��� j,(;r`t J�v,c°�`s'Phone Number: ;•��.-�7�;--���j <br /> Mailing Address: >'��G,�� �,. ,F'��, �r�� City: j�a,Kr�__ Zip: SS'3�/ <br /> *** DO NOT MAII. PAYMENT�'ITH THIS APPLICATION*** <br /> GENERAL INSTRUCTIONS <br /> l. Applications for septic system permits may be mailed or submitted in person at the City <br /> Off�ices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> A�ency(MPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rough up but prior to sand placement(sand will be jar tested for silt content), and again <br /> during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installers License shall be present during all inspections. A 24-houi- <br /> notice is required for all inspections. <br />