Laserfiche WebLink
� <br /> /���, <br /> ''� � '� <br /> ir .�. <br /> ;o o�;' <br /> � . ����� ��T� o� o�o�ao► <br /> � r� ,��� = r �� - ��� Municipal Offices <br /> ��� ,a � <br /> � "�, ,{ _ ti „� <br /> , "� �I `"' ' , :� `� G,!i Street Address: Mailing Address: <br /> ;�. t ' �..,:; ` '�;:;"/ P.O. Box 66 <br /> ,. <Q � 2750 Kelley Parkway <br /> � �:-.,kESITO %-' Crystal Ba MN 55323-0066 <br /> ���� Orono, MN 55356 Y� <br /> To: The Current Owner of Address � `�� �� ��`-f" }�`�S` �e <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewa�e treatment system at the above <br /> address has been inspected and the following is l:nown about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brou�ht into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> le�al action. <br /> System Identified as Non-Compliant <br /> Yes �No <br /> If yes, system must be brouaht into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tanl:be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> �, j��-c�� . The tank(s) should be cleaned throuQh the manhole and <br /> not throu�h the inspection pipes, tlus allows for proper cleanin�. <br /> Comments: <br /> �� <br /> ; � , f j_U�, <br /> Inspecto�� Date of Inspection <br /> Telephone(9�Zj 249-4600 • Fa� (9�21 2�9-4616 <br />