My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00619 - septic
Orono
>
Property Files
>
Street Address
>
C
>
Countryside Drive
>
2450 Countryside Drive - 04-117-23-11-0004
>
Septic
>
2015-00619 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:05:48 PM
Creation date
4/29/2016 2:31:47 PM
Metadata
Fields
Template:
x Address Old
House Number
2450
Street Name
Countryside
Street Type
Drive
Address
2450 Countryside Dr
Document Type
Septic
PIN
0411723110004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materials Worksheet UNIVERSITY ��,� <br /> Minnesota Pollution OF MINNESOTA <br /> Control Agency �,1� <br /> ProjectiD: v 06.12.13 <br /> A• Calculate Bed (rock)Vo(ume: Bed Length (2.0 X Bed Width 2.6)X Depth =Volume ft' <br /> 50.0 ft X 10.0 ft X 1.0 = 500.0 ft; <br /> Divide ft3 by 27 ft3/yd'to calculate cubic ards: <br /> 500.0 ft' : 27 = 18.5 yd3 <br /> Add 20%for constructability: 18.5 yd'X 1.2 = 22.2 ' <br /> yd <br /> B. Calculate Clean Sond Volume: <br /> Volume Under Rock bed:Average Sond Depth x Media Width x Media Length =cubic feet <br /> 1.3 ft X 10.0 ft X 50.0 ft = 658.3 ft3 <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft •1) X X ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Tota(Clean Sand Vo(ume: Volume from Lenqth+ Vo(ume from Width+Vo(ume Under Media <br /> ft' + ft3 + ft' = ft3 <br /> For a Mound on a slope greater than 1% <br /> Ups(ope Volume: ((Upslope Mound Height - 1)x 3 x Bed Length��2=cubic feet <br /> (( 3.2 ft -1) X 3.0 ft X 50.0 )�2= 162.5 ft3 <br /> Downslope Volume: ((Downslope Height- 1) x Downslope Absorption Width x Media Length)-2=cubic feet <br /> (( 3.5 ft-1) X 16.0 ft X 50.0 )-2= 986,7 pt' <br /> Endslope Vo(ume: (Downslope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 3.5 ft- 1 ) X 3.0 ft X 10.0 ft = 74.0 f�3 <br /> Total C(ean Sand Vo(ume: Upslope Vo(ume +Downslope Vofume +Ends(ope Vo(ume +Volume Under Medio <br /> 162.5 ft' + 986.7 ft' + 74.0 ft' + 658.3 3 3 <br /> ft = 1881.5 ft <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 1881.5 qt3 , 27 = 6q,7 yd' <br /> Add 20%for constructability: 6g,7 = <br /> yd3 X 1.2 83.6 yd' <br /> C. Calculate Sandy Berm Volume: <br /> Tota(Berm Vo(ume(approx): ((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)-2=cubic feet <br /> ( 3.3 _ 0.5 )ft X 41 A ft X 72.0 )-2= 4157.4 ft' <br /> Tota(Mound Vo(ume-C(ean Sand volume-Rock Volume=cubic feet <br /> 4157.4 ft' _ 1881.5 ft' _ 500.0 ft3 = 1775.9 q�; <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: »�5•9 ft' : 27 = 65.8 yd' <br /> Add20%forconstructability: (,5,g Yd3 X �,2 = �g.q yd3 <br /> D. Calculate Topsoil Materia!Vo(ume: Totol Mound Width X Tota(Mound Length X.5 ft <br /> 41.0 ft X 72.0 ft X 0.5 ft = 1476.0 ft3 <br /> Divide ft'by 27 ft'/yd3 to catculate cubic yards: 1476.0 ft' : 27 = 54.7 yd3 <br /> Add 20%for constructability: 54•7 yd3 x 1.2 = 65.6 yd3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.