Laserfiche WebLink
� Clt� o� ORONO <br /> • RESOLUTION OF THE CITY COUNCIL <br /> � � NO. 2251 <br /> • - � • <br /> .r,; <br /> F) RLS 1098 was approved by the City in 1963 prior to the <br /> current . RR-1B, two acre minimum lot standards that became <br /> effective in September of 1967. The majority of the properties <br /> within the RLS have been developed under less restrictive setback <br /> standards. <br /> 4. The City Council has considered this application including the <br /> findings and recommendations of the Planning Commission, reports by <br /> City staff, comments by the applicant and the effect of the proposed <br /> , variance on the health, safety and welfare of the community. <br /> 5. The City Council finds that the conditions existing on this <br /> property are peculiar to it and do not apply generally to other <br /> property in this zoning district; that granting the variance would not <br /> adversely affect traffic conditions, light, air nor pose a fire hazard <br /> or other danger to neighboring property; would not merely serve as a <br /> convenience to the applicant, but is necessary to alleviate a demon- <br /> • strable hardship or difficulty; is necessary to preserve a substantial <br /> property right of the applicant; and would be in keeping with the <br /> spirit and intent of the Zoning Code and Comprehensive Plan of the <br /> City. <br /> CONCLIISIONS, ORDffit d�IdD CONDITIONS <br /> Based upon one or more of the f indings noted above, the Orono <br /> City Council hereby grants variances per Municipal Zoning Code Section <br /> 10.27, Subdivision 5 (B) to permit the construction of a single family <br /> residence on the property located at 965 Edgewood Hills Road, subject to <br /> the following conditions: <br /> 1. Prior to issuance of a building permit, the applicant must submit <br /> septic design and f inal site grading plan for all alterations <br /> invol ving driveway (turnaround), house foundation and grade changes to <br /> redirect drainage from septic area. <br /> 2. Applicant must provide City with temporary erosion control plan to <br /> cover entire construction period, this would include all preliminary <br /> grading submitted at the time of application for building permit. <br /> 3. The alternate and principal septic test areas must be protected <br /> with temporary fencing prior to any land alteration activity on the <br /> site. <br /> • 4. Applicant shall grant to the City an underlying road and utility <br /> easement over an existing easement that has been designated as a part <br /> of a future turnaround for Edgewood Hills Road. <br /> 5. No other variances are granted or permitted for this structure. <br /> Page 2 of 4 <br />