Laserfiche WebLink
r � . <br /> ' � � City o� ORONO � <br /> �, <br /> • RESOLUTION OF THE CITY COUNCIL <br /> � NO. 2239 <br /> • - • • <br /> 5. The private road shall be constructed to City private road <br /> requirements, subject to a developers agreement to be executed between <br /> the City and the developer. Private road construction can begin as <br /> soon as the engineering plans for the road have been approved by the <br /> City and the developers agreement has been executed. Plat road Outlot <br /> A is to be developed now to serve Lots 1 and 2, Block 1 and Lots 1, � 2 <br /> and 3, Block 2. Outlot B is provided as corridor for future private <br /> . road access to Lot 3, Block 1. At such time that Lot 3, Block 1 is <br /> divided into 2 or more lots, Outlot B shall be developed to private <br /> road standards. Outlot C is provided for future roadway connection to <br /> the plat road of the subdivision of Lot 2, Block l, Foxwood; this will <br /> stay as a private road outlot, not developed but available to create a <br /> "through" route if these private cul-de-sac roads ever become public <br /> roads. Outlots A and C shall be owned and maintained jointly by the <br /> owner of Lots 1 through 3, Block 1 and Lots 1 through 3, Block 2 and <br /> shall be included in the Declaration of Private Road Easement and <br /> Dedication for Maintenance of Same. <br /> • 6. Standard road and utility easements and private road maintenance <br /> covenant to be filed with the plat. <br /> 7. Standard drainage and utility easements to be shown on plat along <br /> lot lines. Provide a 20' wide drainage easement along swale at neck <br /> of Lot 1, Block 1. Provide a 20' wide drainage and utility easement <br /> along the west line of Lot 1, Block 2. <br /> 8. Conservation and Flowage Easements to be dedicated over the two <br /> major wetlands and over the low area below elevation 940' straddling <br /> the line between Lots 2 and 3, Block 1. <br /> 9. Payment of standard park fees of $200 each for Lots 1, 2 and 3, <br /> Block 2 and Lot l, Block 1, and $100 for Lot 3, Block l. Total = <br /> $900. . <br /> 10. Payment of revised application fee for the revised proposal in <br /> the amount of $325.00 per staff inemo of 7/8/87. <br /> 11. No building permits will be issued until the private road base <br /> work has been completed and been approved by the City. <br /> 12. The private road shall be allowed to access directly to County <br /> Road 84 subject to conditions for such access as imposed by the <br /> Hennepin County Department of Transportation in their required access <br /> • permit. <br /> 13. The private road shall be privately owned and maintained per the <br /> appropriate access easement/maintenance documents to be executed by <br /> the developer. <br /> Page 4 of 6 <br />