Laserfiche WebLink
' {� �r P�i <br /> %�� �-. , <br /> CITY OF ORONO SEPTIC SYST'EM PER1vIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, NIN 55323 -���'%-��-� � ,; ,��t<� <br /> � . <br /> `������ 1 <br /> JOB SIT'E ADDRESS• �.c'> 7� � �� ���C � l�4 I�� )i�� <br /> -, <br /> Occupancy Type: Residential �_ Commercial Other <br /> Permit Type: 'e�v o�' Replacement Sy�stem, $100.00 <br /> epair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> � *See fee schedule for non-residential permit fees <br /> O�mer's Name: �c�/�.i ��E�.�� _ Phone Number: � �fv°' %��� <br /> Nlailing Address:_J �5 vU���1� �l��r�x 14% _ City: � ;i,�- - ZIp: ��� � <br /> Contractor's Name: ��j,� ,�� �-�-{��L�.� �As� �one Number:�;�'��� -�'7�J <br /> Nlailing Address: J���,i fo��/' �% /L� City: c „�P� `r�� <br /> DO NOT NiAII. PAYMENT WITH THIS APPLICATION <br /> GENERAL I'i�1STRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4. The followin; inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> afrer rou�h-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain during pressure distribution pipin� installation in the rock bed. <br /> D. Fi.nal inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br />