My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P05647 - demo
Orono
>
Property Files
>
Street Address
>
C
>
Concordia Sreet
>
1725 Concordia Street - 17-117-23-22-0044
>
Permits/Inspections
>
2002-P05647 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:33:44 PM
Creation date
4/27/2016 11:37:56 AM
Metadata
Fields
Template:
x Address Old
House Number
1725
Street Name
Concordia
Street Type
Street
Address
1725 Concordia Street
Document Type
Permits/Inspections
PIN
1711723220044
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sep-09—��02 09:35am From—CITY OF ORONO +9522494616 T-99T P 003/O11 F-924 <br /> , . <br /> , <br /> 7. Within 5 workina days of superstructure removal,a final inspection shall be requested. The <br /> site shall be left clean and cleaz of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation (except �vhen such excavation is to be used as part of a new <br /> building and such new buildin� is actually under construction). <br /> 8. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses,including attorney fees,against the City,its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> 9. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks must <br /> be pumped,crushed and filled w�ith native soils. An inspection is required afrer the tanl:s are <br /> pumped and before the tanks aze crushed and filled. <br /> PERl'�IIT TYPE A.'�� FEE CAT.CYTLATION <br /> � �50.00 - Principal Structure <br /> � $30.00 - Accessory Structure <br /> 1. Subtotal of above permit requested � SU� 00 <br /> 2. State Surcharge � -�� <br /> 3. TOTAL T'ERl�iIT PEE (add lines 1-2 above) $ SO• 5� <br /> The undersigned hereby applies to the City of Orono for.issuance of a Demolition Permit,agrees to <br /> do all work in strict accordance�vith the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all statements made on this application are complate, true and correct. <br /> APPLICANT'S SIGNATU�: �w � � Date: � �� �Z <br /> OtiVi�'ER'S STGNATURE: Date: <br /> APPROVED BY- Date: �. 2 �_'°? <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.