Laserfiche WebLink
RHVAC -F�esidential HVAC Load Calculations =,, Elite Software Development,Inc. <br /> Flare Heating&A/C Inc. ,{ Rambler Townhome Duplex(Stonehaven) <br /> Golden Valley, MN 55427-3700 l Page 1 <br /> Pr�afect Report <br /> General Project Information <br /> Project Filename: S:\FHDATA\PROJECTS\Z&B\stonebay rambler stonehaven.rhv <br /> Project Title: Rambler Townhome Duplex (Stonehaven) <br /> Designed By: Randy <br /> Project Date: 4-14-06 <br />• Project Comment: Stone Bay, Orono <br /> Client Name: ZB Companies, Inc. <br /> Client Address: 10300 10th Avenue North <br /> Client City: Plymouth, Minnesota 55441 <br /> Client Phone: 763-545-1200 <br /> Client Fax: 763-545-1112 <br /> Client E-Mail Address: zbcompanies@aol.com <br /> Client Comment: <br /> Company Name: Flare Heating &Air conditioning, Inc. <br /> Company Representative: Randy <br /> Company Address: 9303 Plymouth Ave. N. <br /> Company City: Golden Valley, Minnesota 55427 <br /> Company Phone: 763-542-1166 <br /> Company Fax: 763-542-3101 <br /> Company E-Mail Address: rimker@flareheating.com <br /> Company Website: flareheating.com <br /> Company Comment: You Can Feel The Difference <br /> DesignData __ __ _ _ . _._ _ __ -- - -- <br /> _ _ <br /> _ __ _ _ <br /> Reference City: Minneapolis, Minnesota <br /> Daily Temperature Range: Medium <br /> Latitude: 44 Degrees <br /> Elevation: 834 ft. <br /> Altitude Factor: 0.970 <br /> Elevation Sensible Adj. Factor: 1.000 <br /> Elevation Total Adj. Factor: 1.000 <br /> Elevation Heating Adj. Factor: 1.000 <br /> Elevation Heating Adj. Factor: 1.000 <br /> Outdoor Outdoor Indoor Indoor Grains <br /> Dry Bulb Wet Bulb Rel.Hum Dry Bulb Difference <br /> Winter: -20 0 0 72 0 <br /> Summer: 95 75 50 75 36 <br /> . <br /> Check Figures - <br /> Total Building Supply CFM: 1,027 CFM Per Square ft.: 0.272 <br /> Square ft. of Room Area: 3,768 Square ft. Per Ton: 1,387.065 <br /> Building Loads <br /> . _ . : <br /> Total Heating Required With Outside Air: 71,917 Btuh 71.917 MBH <br /> Total Sensible Gain: 24,582 Btuh 75 % <br /> Total Latent Gain: 8,016 Btuh 25 % <br /> Total Cooling Required With Outside Air: 32,598 Btuh 2.717 Tons (Based On Sensible + Latent) <br /> 2.731 Tons (Based On 75% Sensible Capacity) <br /> . <br /> Notes <br /> Calculations are based on 7th edition of ACCA Manual J. <br /> All computed results are estimates as building use and weather may vary. <br /> Be sure to select a unit that meets both sensible and latent loads. <br /> S:\FHDATA\PROJECTS\Z&B\stonebay rambler stonehaven.rhv Tuesday, August 22, 2006, 2:52 PM <br />