My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P02804 - new structure
Orono
>
Property Files
>
Street Address
>
C
>
Concordia Sreet
>
1687 Concordia Street - 17-117-23-22-0024
>
Permits/Inspections
>
2000-P02804 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:33:15 PM
Creation date
4/22/2016 2:12:47 PM
Metadata
Fields
Template:
x Address Old
House Number
1687
Street Name
Concordia
Street Type
Street
Address
1687 Concordia Street
Document Type
Permits/Inspections
PIN
1711723220024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 2: SITB WORK <br /> 1. During demolition all property and personnel shall be safely protected. <br /> 2. Provide barricades from dust and debris, <br /> 3. Report any known toxic or harmful materials when present. <br /> 4. Report any discrepancies or hidden items to the architect during demolition. <br /> 5. Contractor hired for removal of e�sting structure shall execute all demolition as <br /> required for new construction and shall have all utilities disconnected <br /> 6. All items of value to be removed or destroyed shall be turned over to the owner for <br /> review. Items refused by the owner shall be disposed of by the Demo contractor. <br /> 7. Remove topsoil as required for excavation. Excess soil to be removed by excavation <br /> contractor. <br /> 8. Excavate to proper depth to min 2500 psf soil bearing capacity. Do not over <br /> excavate. <br /> 9. Provide sand compaction as indicated on drawings. <br /> 10. Install and coznpact a 4" - 6"Class 5 base under all concrete slabs and sidewalks <br /> 1 l. Protect existing trees,shrubs, grass, utilities and buildings during excavation. <br /> 12. Backfill as not to disturb foundations. <br /> 13. Rough grade to approximate fina.l elevations as soon as possible without damage to <br /> new ar existing construction by excavating contractor. <br /> 14. Final grade to insure proper drainage away from building in smooth contours around <br /> building by excavating contractor per site plan. <br /> 15. Landscaping: Owner to provide and insta,ll black dirt to be leveled and smoothed <br /> and free of rocks, plants and clumps of dirt by Excavating Contractor. <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.