Laserfiche WebLink
I <br /> I <br /> i <br /> � - <br /> SPECIFICATIONS <br /> DIVISION 1: GENER�,L REQUIREMENTS <br /> 1. The Project shall consist of the construction of the:Residence for John and Kristen <br /> Gehring(pwners)at 1687 Concordia St. Orono,MN 55391 (I� 952-471-09Q3 (Cell) <br /> 612-719-4158 (Fax) 425-963-4115 (E-Mail)GehringJN@AOL.com. The Owner <br /> sha11 secure and pay for a11 permits, licenses and fees required for the above project. <br /> 2. Each separate contractor shall cooperate with the Owner and all other contractors to <br /> ensure that the work of the project is conducted harmoniously, orderly, timely and in <br /> proper sequence in a workmanlike fashion. <br /> 3. Work siiall not commence until the contract has been fully executed, all contractors <br /> pro��ide proof of insurance and the owner gives notice to praceed. <br /> 4. All colors, patterns and finish materials s1�a11 be approved by Owner. <br /> 5. A11 materials shall be stored to prevent damage. �amaged material shall be replaced. <br /> 6. Each contractor shall inspect the work of others which sha11 receive or be adjacent to <br /> his Work. Commencing Work shall be construed as acceptance of work done by <br /> others. All manufactured components, such as trusses, cabinets, windo�vs, doors etc. <br /> shall be field measured ancl conditions verified by sub-cont�actor involveci. Truss <br /> supplier and cabinet maker shall provide architect with shop drawings showing layout. <br /> 8. Patch ercisting property on or adjacent to the site when dishirbed. <br /> 9. Contractors shall comply with all codes, ordinances and other public rules bearing <br /> on his Work. <br /> 10. If a Change in the Work is ordered by the owner, the Architect shall notify the <br /> contractors who will in turn revise the contract sum to reflect the cha.nge. <br /> 11. Owner shall provide temporary heat, light, power,water for the duration of the <br /> project. <br /> 12. Contractors shall provide weather protection as required to maintain the integrity of <br /> the Work in progress. <br /> 13. Contractors shall provide temporary shoring and bracing as required for safety <br /> sake. <br /> 14. All public and private property affected by the contractors shall remain clean and <br /> debris free. <br /> 15. The Caiitractors shall keep the project a�id nearby premises cleau and free of debris. <br /> 16. The Ounier shall provide for a means uf tem�orary erosion control as required. <br /> 17. Upon completiou of the project contractors shall leave a clean site, free of tools and <br /> equipment. <br /> _ 18, Final payment sha11 be issued by the owner oi�ly when a11 punch list items are <br /> completed to the satisfaction of the owner and the architect. <br /> 19. Contractors shall furnish the owner with Lien Waivers for all labor and materials. <br /> - 20. Contractors shall Warranty work according to Minnesota State laws. <br /> � <br />