Laserfiche WebLink
� f <br /> `��-., FOR CITY USE ONLY j <br /> � l, c � Z J II� ___ <br /> ���.0��� Clty Of�I'OilO DateReceivedE�_�,_ ��: P�it# _ �/ <br /> � ��� P.O.Box 66 Amow�r. S <br /> % 2750 Kelley Parkway � <br /> ' � � ' Crystal Bay,MN 55323 Approved By: <br /> y � (952)249-4600 <br /> F <br /> � �' Recommends: A roval Denial ❑ <br /> AK�S H c?�i <br /> �`'-___-� <br /> CITY OF ORONO—AUTOMATIC FIRE SPRINKLER/GENERAL PERMIT <br /> (All permits must be approved by the I�irc�1arshall and/or Building Official) <br /> 1. Permits are required for all fire sprinkler installation and repair. All work shall be done by a�icensed <br /> fire sprinkler contractor. Two sets of plans, specification data sheets, fire flow tests and hydr.ulic <br /> calculation sheets shall be submitted to the Orono Fire Marshal a mi_l�imu���_c�t:_7.cia�Ts__ht.t:c�re._titart_o(.� <br /> ��ork. <br /> 2. Permits can be applied for by mail at PO box 66,Orono, MN, 55323 or in person at, <br /> 2750 Kelly Parkway;Phone: (952)249-4600. Permits are also available online at: <br /> wtivw.ci.orono.mn.us <br /> 3. All systems shall be designed, installed and maintained to N.F.P.A.-13,N.F.P.A.-25,Minnesota State <br /> Building Code,Minnesota State Fire Code and Standards. All attic systems are to be spaced at <br /> maximum 130 square foot coverage. Plastic pipe will not be allowed at any time in attic spaces. <br /> 4. All equipment installed shall be U.L. or F.M. approved for fire protection service. Water flow test <br /> shall be completed on all new systems. Water flow test reports shall be submitted to the Orono Fire <br /> Marshal along with plan submittal. <br /> 5. Yard or wall post indicator valves are required. All indicating and control values installed shall be <br /> provided with tamper protection. On dry systems,the control valve to service the pressure switch(air) <br /> shall be supervised. <br /> 6. Inspectors test valve shall be installed on each floor level or zone of system. All systems shall have <br /> main drain and inspectors test valves piped to the outside. <br /> 7. No water is to be introduced into the sprinkler system until main has been thoroughly flushed. 200# <br /> air test and flushing shall be witnessed by the City of Orono Water Department. <br /> 8. An approved audible/visual device wired to main flow switch shall be installed above F.D. <br /> connection and in areas normally occupied by tenants. <br /> 9. EXISTING SYSTEMS: If any changes in the hydraulically most demanding area, change in <br /> occupancy classification or an addition of 20 or more heads,hydraulic calculations and flow test will <br /> be required. <br /> 10. The Orono Fire Marshal shall witness all final flow or trip tests. Appointments can be made by <br /> calling the Fire Marshall at(952)473-9701, 8:00-4:00 p.m. Monday-Friday. 24-hours notice is <br /> requested. <br /> 1 1. When required, (30 foot building height) stairwell standpipe's shall have 2 %z gate valves installed <br /> with 2 '/z x 1 '/z caps. <br />