My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-28-2016 Council Packet
Orono
>
City Council
>
2016
>
03-28-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 11:06:12 AM
Creation date
4/19/2016 11:02:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br /> <br />DATE: March 28, 2016 <br /> <br />ITEM NO: 3 <br />___________________________________________________________________________________________ <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Adam Edwards JML Public Works Director/ <br />Title Public Works Director/City Engineer City Engineer’s Report <br />____________________________________________________________________________________ <br />Item Description: Well #1 Rehabilitation <br />________________________________________________________________________________________________________ <br /> <br />List of Exhibits <br />A Quote Tabulation <br /> <br />1. Purpose. The purpose of this action item is to gain Council approval to proceed with the <br />rehabilitation of Well #1. <br /> <br />2. Background. Well rehabilitation should take place every 7-10 years to ensure issues are detected <br />early and before they become major problems. Well #1 last went through a deliberate inspection and <br />maintenance process in 1999. As an addition to the water plant upgrade project of 2015 water level <br />transducers were to be installed in all three wells. Due to the configuration of well #1 this was not <br />possible. <br /> <br />3. Scope. Work includes removing and replacing vertical turbine line shaft; inspecting and <br />repairing the pump and electric motor; replacing bearings; painting; and installing a water level <br />transducer. <br /> <br />4. Cost & Funding. The low quote is for $24,245 from Bergerson – Caswell, Inc. of Maple Plain. <br /> <br />Fund Cost Amount Allocated <br />in the CIP <br />Est. Fund Balance at <br />end of 2016 <br />Water Fund $24,245 $20,000* $421,090 <br />Total $24,245 * did not include transducer installation. <br /> <br />5. Timing. Work will be completed in March/April to ensure full capacity prior to the summer high <br />water usage period. <br /> <br />COUNCIL ACTION REQUESTED: <br />Consider a motion to accept the quotation in the amount of $24,245 from Bergerson – Caswell, <br />Inc. for rehabilitation of Well #1.
The URL can be used to link to this page
Your browser does not support the video tag.