My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-011191 - demo
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Lane
>
3260 Bohns Point Lane - PID: 08-117-23-44-0008
>
Permits/Inspections
>
1999-011191 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:17:43 PM
Creation date
4/18/2016 3:26:52 PM
Metadata
Fields
Template:
x Address Old
Address
3260 Bohns Point Ln
Document Type
Permits/Inspections
PIN
0811723440008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. �����/ <br /> CITY OF ORO�'O APPLICATION FOR DEMOLITION PER�titIT <br /> � P.O. Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, �iN 5�323 = <br /> SPECIAL COiVDITIONS & HOLD HAR�I�TI.ESS AGREEMENT' <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. burning, well abandonaiment, etc. <br /> 2. Work must not be�in unless the permit card is available on the job site. <br /> 3. A 24 hour notice is required for all inspections. Call 473-7357. <br /> JOB SITE ADDRESS: 6� o �� �-� <br /> Occupancy Type: Residential Commercial <br /> O`�'ER'S NQu�IE: � b�- �/�/QT�'L�Ll�R Phone: �'�J�'�.5� <br /> Mailin� Address: f �o .,2rNT'�Re._.�4c.l�ElY Ll� CitY�T nr/ri4- AY, k <br /> 'SS33/ <br /> ? CONTRACTOR'S NAIVIE: Bus. No.: <br /> ' Mailing Address: City: <br /> Demolition if planned by means of: � manual disassembly <br /> heavy equipment <br /> �_ burnin� (by fire department) <br /> Permits Issued: <br /> # Burning Fire Department <br /> # Well Abandonment <br /> In return for issuance of said Demolition Permit, the undersigned owner hereby agrees as <br /> follows: �.. <br /> 1. The sttucture(s) shall be kept e�closed and/or seeured until such time as demolition is <br /> c.omplete. . <br /> 2. Demolition debris will be kept off adjoinin� property�'�ancUor the public rights-of-way <br /> unless specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundatians shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable P�A requirements. . <br /> 5. Water wells must be abandoned in accordance with State Health Department re;ulations. <br /> 6. Inspection required when all debris has been removed, before bac�illing. <br /> ., <br />
The URL can be used to link to this page
Your browser does not support the video tag.