My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-007837 - deck
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Lane
>
3225 Bohns Point Lane - PID: 08-117-23-44-0010
>
Permits/Inspections
>
1996-007837 - deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:17:48 PM
Creation date
4/18/2016 3:20:17 PM
Metadata
Fields
Template:
x Address Old
Address
3225 Bohns Point Ln
Document Type
Permits/Inspections
PIN
0811723440010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . <br /> � Page 2 <br /> STRUCTURAL SPECIFICATION <br /> $WEATT RESIDENCE <br /> WAYZATA MN <br /> ARCHISTRUCTURES #9512-3 <br /> SECTION <br /> 01010 2•O] SUBSTITUTIONS <br /> S U M MA RY O F T H E W O R K A. Materials and work described in this <br /> specification and in the construction documents <br /> shall establish the standard for any substitution. <br /> PART 1:GENERAL B. When the name of a manufacturer is specified, <br /> whether or not the name is followed by the term <br /> 1.01 DESCRIPTION OF THE WORK "or equal," any substitutions shall be approved <br /> by the engineer. <br /> A. Work included: This structural specification <br /> covers the materials and construction related to <br /> structural framing for Sweatt Residence. PART 3:CONSTRUCTION <br /> B. Work not included: This structural specifica- 3.01 USE OF CONSTRUCTION DOCUMENTS <br /> tion does not cover non-structural elements of <br /> the project, such as architectural, mechanical A. Field conditions: Contractor shall verify all <br /> and electrical work. field conditions. Report any error, omission, or <br /> inconsistency between existing conditions and <br /> 1.02 QUALITY ASSURANCE the construction documents to the engineer prior <br /> to construction. <br /> A. Governing building codes: All work described <br /> in this specif►cation and in the construction B. Discrepancies: Contractor shall review the <br /> drawings shall be performed in accordance with structural specifications and other structural <br /> the following codes: documents prior to construction. Report any <br /> discrepancies or omissions within them - or <br /> • The 1995 Minnesota State Building Code between them and other non-structural <br /> (MSBC). specifications and documenu - prior to <br /> construction. <br /> • Intemational Conference of Building <br /> Officials (ICBO), 1994 Uniform Building C. Document redundancy: 'The structural <br /> Code (UBC) and 1994 Dwel[ing materials and work required for this project may <br /> Construction under the Uniform Building be described either in the specifications or in the <br /> Code, as adopted by the MSBC. construction drawings, but not necessarily in <br /> both documents. <br /> B. Local codes and ordinances: All work shall <br /> also be performed in accordance with the 3.02 SAFETY <br /> requirements of any local governing authorities <br /> having jurisdiction. These requirements shall A. The contractor shall be responsible for the <br /> prevail, if more restrictive than the building safety of persons on the site and adjacent <br /> codes. properties, as well as compliance with all local, <br /> state and federal safety regulations during <br /> C. Other standards: It is the intent of these construction. <br /> construction documents that all work shall be of <br /> "good" and "custom" quality, performed 3.03 FORMWORK,SHORING&BRACING <br /> according to best practices of the trade, <br /> manufacturers' product recommendations, and A. The contractor shall be responsible for the <br /> any addi[ional standards mentioned in this design and erection of all formwork, shoring, <br /> specification. and temporary bracing required for construction <br /> until the project is complete.Any stockpiling of <br /> materials on the structural framing is at <br /> PART 2: MATERIALS contractor's own risk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.