My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-007837 - deck
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Lane
>
3225 Bohns Point Lane - PID: 08-117-23-44-0010
>
Permits/Inspections
>
1996-007837 - deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:17:48 PM
Creation date
4/18/2016 3:20:17 PM
Metadata
Fields
Template:
x Address Old
Address
3225 Bohns Point Ln
Document Type
Permits/Inspections
PIN
0811723440010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� .I ► <br /> � Page 12 <br /> STRUCTURAL SPECIFICATION <br /> SWEATT RESIDENCE <br /> WAYZATA MN <br /> ARCHISTRUCTURES #9512-3 <br /> 3. Vertical nailing on wide face of beam: <br /> 2.06 MANUFACTURER'S WARRANTY Shall be spaced as specified in UBC code <br /> for#2 Douglas Fir. <br /> A. Delivery:The products shall be delivered to the <br /> site free of errors or defects in workmanship END <br /> and material. <br /> B. Performance: The products shall be warranted <br /> to perform to the manufacturer's specifications <br /> for the normal and expected life of the building. <br /> PART 3:CONSTRUCTION <br /> 3.01 ERECTION <br /> A. Temporary storage: All prefabricated wood <br /> materials shall be carefully stored and protected <br /> from the weather until installation. <br /> B. Installation: Shall be in accordance with the <br /> construction drawings as well as any drawings <br /> and recommendations provided by the <br /> manufacturer. <br /> 3.02 CONNECTIONS <br /> A. Contractor's responsibility: Contractor is <br /> responsible for proper connection and bearing <br /> of all prefabricated members. See section 06060 <br /> of this specification: Wood connectors and <br /> supports. Contact engineer for design <br /> assistance. <br /> B. Nailing into LVL and PSL beams: <br /> 1. Lateral nailing and withdrawal: Load <br /> capacity shall be as specified in UBC code <br /> for#2 Douglas Fir. <br /> 2. Nailing along narrow(top)face of beam: <br /> Minimum spacing shall be: <br /> • 8d nails:3 inches. <br /> • lOd or 12d nails:4 inches. <br /> • 16d nails on an LVL beam: 5 <br /> inches. <br /> • 16d nail on a PSL beam:8 inches. <br />
The URL can be used to link to this page
Your browser does not support the video tag.