Laserfiche WebLink
ORONO HARDCOVER CALCULATION WORKSHEET <br /> LAKESHORE A. Existing B. Existing C . Existing D. Proposed E . Proposed F . Allowed <br /> hardcover hardcover <br /> SETBACK lot area hardcover hardcover hardcover <br /> ZONE in zone in zone Percentaqe in zone Percentage <br /> [ (B;A) x 100] [ (D;A) x 100] Percentage <br /> 0-75 ' sf sf "�� sf_ �/� � ��' <br /> � <br /> 75-250 ' ��f -, sf �� ` ' sf ' � �^ �' � �� '-� sf _�,� � % 25 �/ <br /> 250-500 ' sf Sf "�� Sf �, 30 ` �- <br /> 500-1000 ' sf sf °�h sf nl� 35 "%� <br /> Directions : <br /> A. Existing Lot Area in Zone - includes the total square footage of dry buildable land <br /> within the specified zone . <br /> B. Existing Hardcover in Zone - includes the square footage of existing roofs , decks, sidewalks , <br /> driveways (qravel or paved) and other rain-impervious surfaces within the specified zone . <br /> C . Existing Hardcover Percentage - divide the number in B by the number in A and multiply by 100 . <br /> D. Proposed Hardcover in Zone - includes the existing hardcover plus all proposed additional <br /> hardcover . <br /> E. Proposed Hardcover Percentages - divide the number in D by the number in A and multiply by 100 . <br /> F . Allowed Hardcover Percentages - if the percentages in column E for any setback zone exceed <br /> the allowed percentages in column F , you should contact the Zoning Department at 473-7357 <br /> to discuss the possibilities of obtaining a variance . Generally, if a concurrent removal <br /> of existing hardcover matches the additional hardcover proposed, resulting in no net increase <br /> of hardcover in a specified zone , a variance may not be necessary. <br />