Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
� � ���3 <br /> CITY OF ORONO SEPTIC SYSTEI�i PERitiIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, 1�1�1 5�323 <br /> Jos srrE annxEss: C�c n ��;�, �.�.�r��0 <br /> r <br /> Occupancy Type: Residential 'L-' Commercial Other <br /> Permit Type: Ne�v or Replacement System, $100.00 L-' <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> , *See fee schedule for non-residential permit fees <br /> Owner's I�'ame: p� ������/� _ PhoneNumber: <br /> I�Iailing Address: City: ti�: <br /> Contractor's Nanne: .�� Q�„ ' �C� t .� ;.�_ �� PhoneN�unber: ��J-<'�!��'� <br /> � <br /> Nlailing Address: %�.:C� s�1 � � /o/ _ City:l'�� ��` �� Z�p� �:��% <br /> ��— <br /> DO NOT MAII.. PAI'i��IENT WTTH THIS APPLICATION <br /> GENERAI. IPtSTRUCTIO\TS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the Ciry Inspector. <br /> 4. The followi.n� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain during pressure distribution pipin� installation in the rock bed. <br /> D. Final inspection to verify proper final co�er depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holdin� MPCA Installer Certificate shall be present during inspections: A 24 <br /> hour notice is required for all inspections. <br />