My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P09096 - new septic system
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
510 Big Island - PID: 22-117-23-14-0002
>
Septic
>
2005-P09096 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:11:28 PM
Creation date
4/18/2016 1:58:04 PM
Metadata
Fields
Template:
x Address Old
House Number
510
Street Name
Big Island
Address
510 Big Island
Document Type
Septic
PIN
2211723140002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' . <br /> , discharge pipe through riser wall. Install a camlock on the discharge pipe between pump and the riser <br /> for easy disconnect. Drill a 3/16" weep hole at the invert of the 90 degree bend in the discharge pipe to <br /> ' allow drain back. Install all high-pressure fittings. <br /> • Drain Field — Excavate the drain field trenches as depicted on Fi�ure 2. Depth of excavation <br /> ' shall be 2 feet on the uphill side and level. Place High Capacity Infiltrator Gravelless Chambers in the <br /> trench bottom connected by gravity drop boxes. The pump will discharge to the first drop box. Back <br /> fill with native soil and seed for cover. <br /> , Limitations - Our investigation, layout, design, and recommendations are based on data submitted. If <br /> conditions considerably different from those described in this report are encountered, we must be <br /> , notified. If proposed construction is changed, we must be notified to evaluate the effect of the changes <br /> on the wastewater system. Any changes to the design must be approved by the designer and will be <br /> assessed additional design costs. If changes are made to the design without the knowledge and approval <br /> ' of the designer the design shall be void. All construction is to be in accordance with the ISTS <br /> regulations. Pipe type and size, installation requirements, septic tank construction, and other <br /> , specifications not depicted in our report are to conform to ISTS regulations. The installer of the system <br /> is to be licensed by the Minnesota Pollution Control Agency. <br /> ' I certify that this plan, document or report was prepared by me or under my direct supervision and that I <br /> am a duly licensed Professional Soil Scientist under the laws of the State of Minnesota. If you have <br /> questions, please feel free to call. <br /> , Sincerely, <br /> n <br /> � (/(/ , <br /> eter . ill , . . . <br /> ' Designer I MPCA Certification#2262 <br /> ' <br /> ' <br /> ' <br /> ' <br /> 1 <br /> ' 3 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.